LOR-U.S. 20 / S.R. 113 Center Ridge Rd. Widening Center Ridge Rd. at Avon Belden Rd. (S.R. 83)

Post on 01-Apr-2015

215 views 1 download

Transcript of LOR-U.S. 20 / S.R. 113 Center Ridge Rd. Widening Center Ridge Rd. at Avon Belden Rd. (S.R. 83)

LOR-U.S. 20 / S.R. 113Center Ridge Rd. Widening

Center Ridge Rd. at Avon Belden Rd. (S.R. 83)

LOR-U.S. 20 / S.R. 113Center Ridge Rd. at Jaycox Rd.

Center Ridge Rd. is the main east-west route and commercial area in the city.

LOR-U.S. 20 / S.R. 113

The project includes widening Center Ridge Rd. from 3 to 5 lanes, upgrading of traffic signals, addition of turn lanes, a 10’ wide multi-use path on the south side, and

a 6’ wide sidewalk on the north side.

LOR-U.S. 20 / S.R. 113

The approximate length of the project is 2.3 miles from Stoney Ridge Rd. to Lear Nagle Rd. Ohio Turnpike Exits 151 and 152 are located approximately 1.5 miles from the intersection of Center Ridge Rd. and Lear Nagle Rd.

LOR-U.S. 20 / S.R. 113The existing roadway is currently exceeding its capacity with an

average daily traffic of over 16,900 vehicles per day.

LOR-U.S. 20 / S.R. 113

The project will address safety concerns and reduce the number of accidents.

LOR-U.S. 20 / S.R. 113Project will relieve traffic congestion.

LOR-U.S. 20 / S.R. 113The project will correct geometric deficiencies such as the offset

intersection at Root Rd. and Ridgeview Blvd.

LOR US 20/SR 113

Project StatusPreliminary Engineering

Completed

Detail Design CompletedEnvironmental Clearance

Completed

Right of Way In ProgressConstruction On Schedule and Budget for

2017

LOR US 20 / SR 113Right of Way Summary

Property Impacts270 Parcels: Includes Temporary, Permanent,

Easements, Relocations43 Relocations: 17 Owners; 26 Tenants = Total 43

Acquisition Status27 parcels have signed agreements186 in negotiations57 parcels in appraisal status

Right of Way Phase completed by May 2015

LOR-U.S. 20 / S.R. 113

Right of Way Cost Estimate

2013 Application 2014 Application

Acquisition $9,500,000 (155) $12,753,200 (227)

Relocation Costs $2,000,000 (23) $2,438,000 (43)

Contingencies (20%) $3,020,240

Real Estate Services $2,198,500

Total R/W Costs $11,500,000 $20,409,940

LOR US 20 / SR 113

Thank You!

Questions?