LOR-U.S. 20 / S.R. 113Center Ridge Rd. Widening
Center Ridge Rd. at Avon Belden Rd. (S.R. 83)
LOR-U.S. 20 / S.R. 113Center Ridge Rd. at Jaycox Rd.
Center Ridge Rd. is the main east-west route and commercial area in the city.
LOR-U.S. 20 / S.R. 113
The project includes widening Center Ridge Rd. from 3 to 5 lanes, upgrading of traffic signals, addition of turn lanes, a 10’ wide multi-use path on the south side, and
a 6’ wide sidewalk on the north side.
LOR-U.S. 20 / S.R. 113
The approximate length of the project is 2.3 miles from Stoney Ridge Rd. to Lear Nagle Rd. Ohio Turnpike Exits 151 and 152 are located approximately 1.5 miles from the intersection of Center Ridge Rd. and Lear Nagle Rd.
LOR-U.S. 20 / S.R. 113The existing roadway is currently exceeding its capacity with an
average daily traffic of over 16,900 vehicles per day.
LOR-U.S. 20 / S.R. 113
The project will address safety concerns and reduce the number of accidents.
LOR-U.S. 20 / S.R. 113Project will relieve traffic congestion.
LOR-U.S. 20 / S.R. 113The project will correct geometric deficiencies such as the offset
intersection at Root Rd. and Ridgeview Blvd.
LOR US 20/SR 113
Project StatusPreliminary Engineering
Completed
Detail Design CompletedEnvironmental Clearance
Completed
Right of Way In ProgressConstruction On Schedule and Budget for
2017
LOR US 20 / SR 113Right of Way Summary
Property Impacts270 Parcels: Includes Temporary, Permanent,
Easements, Relocations43 Relocations: 17 Owners; 26 Tenants = Total 43
Acquisition Status27 parcels have signed agreements186 in negotiations57 parcels in appraisal status
Right of Way Phase completed by May 2015
LOR-U.S. 20 / S.R. 113
Right of Way Cost Estimate
2013 Application 2014 Application
Acquisition $9,500,000 (155) $12,753,200 (227)
Relocation Costs $2,000,000 (23) $2,438,000 (43)
Contingencies (20%) $3,020,240
Real Estate Services $2,198,500
Total R/W Costs $11,500,000 $20,409,940
LOR US 20 / SR 113
Thank You!