Click to add Title 4 UPS
Contents
Click to add Title 1 Huawei DataCenter Overview
Click to add Title 2 MicroDC
Click to add Title 3 IDS1000/2000
2
Traditional data center (1995)
Mainframe (1945)
Cloud data center(2004)
• Physically distributed,
logically centralized
• Cross-Data Center Disaster
recovery
• Applications move with users
?
•IT resource centralization ,
enhanced computing capability
•High energy consumption(PUE:
2-3)
•Virtualization improves resource
utilization
•Data center automation
(2013)
Constructing partitioned datacenter is the most disruptive technologies in influencing datacenter future trends
-- Carl Claunch (Gartner)
•Autonomous computing (5000
operations per second )
•High resource use: 170 m2, 150KW
Power
History of Data Center
3
Low-value
services
How to develop more value-added services?
Low resource
utilization
Complex
operation
Low reliability
Large energy
consumption How to make data centers greener?
How to get rid of low resource utilization?
How to respond to rapid changes in the market through agile management?
How to build a customer-centric IT infrastructure?
Revenue
TCO Operation
>1 day MTTR
>60%Low-value services
Energy consumption share 60%↑
PUE>2.5
<30% Resource utilization
>30day go-to-market
Traditional DC challenges
4
New services More efficient, green
Modular room,
high efficiency
refrigeration
system:
PUE<1.6
Cloud
computing,
virtualization:
60%+ resource
utilization rate
CRM SME /individual client
Enterprise /SME
Enterprise
Cloud service:”resource delivery”
VDC:”solution delivery”
ITaaS: “services delivery”
VDC
IT hosting
Opex 30%↓
Capex 40%↓
Improving DC can Improve Business
5
Fragile: single node failure may cause business
outage. $35 million/min (communication)
$42 million/min (manufacturing )
High energy consumption : electricity cost
accounts for 80% of IT OPEX
Inefficient :IT resource utilization < 15%
Most large enterprises have multiple data
centers. In addition to two-site three-center in
headquarters, there are many small distributed
stovepipe data centers.
Multiple data centers are common
Major telecom carrier: 90+ data centers. An enterprise in
Shenzhen: 38 data centers. Huawei: 100+ data centers ……
Data source: Qualix Group, Huawei MI
Challenges of Traditional Data Center Infrastructure
6
Efficient: support agile services
Reliable: ensure business continuity
Green: reduce investment and energy use
Fierce competition, varied requirements from customers and business groups change frequently, all
this requires an agile Data Center Architecture CIO TOP 10 strategies of 2013
Delivering business solutions
Improving IT management and governance.
Improving IT organization and workforce
Reducing the cost of IT
Consolidating IT operations and resources
Expanding the use of information and analytics
Implementing mobility solutions
Implementing business process improvements
Improving business alignment and relationships
Developing or managing a flexible infrastructure
Gartner:Top Predictions for 2013
An Agile Data Center is Required
7
DC2 Distributed Cloud Data Center
Virtualization and unified
management make more
efficient
Distributed architecture make more
reliable
Virtualization and unified
management make more green
Distributed Cloud Data Center Features
8
Layer 1 – Equipment Room Infrastructure
Layer 2 - IT Infrastructure
Layer 3 – Business Platform
Operation Management
IT Service Management
IT Infrastructure Management
Resource Management
Equipment Room Infrastructure
Maintenance and Operation
Integrated Implementation
High Level Design
Assessment and Optimization
Integration and Migration
Professional Services
Project Management Cabling Security Monitoring Cabinet Cooling Power
Supply
Computing Network Storage Security
Cloud OS(Distributed,Parallel Computing,and Automated Management)
Virtualization(Computing,Storage,and Network Virtualization)
Application Development
Platform Middleware Database
•ERP Private Cloud
远程运维 深化设计
咨询规划
Fire Extinguishing Constructing
Unified Portal
•MicroDC •Data Center Disaster Recovery and Backup
•Data Center Integration
•National Data Center
•E-Government
•E-Health Low Level Design
Consulting and Planning
•E-City •Digital TV
Station •E-Police
•Electricity Marketing
Huawei Data Center Solution Architecture
9
SME/Branch
Worldwide
Enterprise E6000 Blade
X6000 for DC
4U 4S / 8U 8S
RH5885 V2
RH2485 V2
2U 4S
ES3000
SSD Card
Micro DC Modular DC
Container DC
Scalability/Reliability
Cloud Datacenter
E9000 Blade
Converged
Infrastructure
RH2285 V2
RH2288 V2
2U 2S
RH1288 V2
1U 2S
X8000
Rack Server
ManageOne DC Management FusionCube
FusionSphere
FusionAccess
S2200T
S5600T
S5800T
Dorado2100 G2
UDS
Dorado5100
S2600T
FusionInsight
N8000
OceanStor18000 Serials (HVS85T/88T )
OceanStor 9000
Complete Data Center Product Family
10
Click to add Title 4 UPS
Contents
Click to add Title 1 Huawei DataCenter Overview
Click to add Title 2 MicroDC
Click to add Title 3 IDS1000/2000
11
Simple & Fast
Unattended Operation
• Standard system. No complex plan is required.
• Convenient delivery. No professional
equipment room is required.
• Good mobility, convenient for migration and
capacity expansion. This avoids investment
waste.
• Centralized management, easy maintenance.
No professional IT O&M personnel are
required at local places.
• High security. Identify potential risks
proactively or as soon as possible, rather
than passive response.
Improve IT agility, help enterprises focus on core business and process
ICT device/branch common application
Power supply and distribution/cabling/
environment monitoring
What Kind of Branch DC is Expected?
12
Unified & remote
management Criterion and standardization
storage network security
Faci
liti
es
ICT
Infr
ast
ruct
ure
File sharing
Rapid deployment
server
Security and data protection
Managem
ent
&
Go
vern
ance
Wireless access Voice PBX
Desk Management
Bra
nch
A
pplica
tion
VDI
PDB UPS Battery
Cabling system Cabinet
(cooling is optional)
Cabinet integration subsystem
Smoke sensor
Temperature and humidity sensors
Water leakage sensor
Dome camera
Ambient sensors Power supply/distribution subsystem
Intelligent PDU
VOIP
MicroDC
Email File
Management
Video surveillance
Huawei MicroDC Architecture
13
Simple & Fast
Unattended Operation
Simple
planning
Fast delivery
Good mobility
and
expansibility
Unified
management
Comprehensive
Security
Why Choose MicroDC
MicroDC
14
MicroDC Typical Configuration(1)
CCU
UPS
Battery
AR
Server
Switch
CCU
UPS
Battery
AR
Server
Switch
Typical Configureation1 24U basic model
less than 50 employees
Typical Configuration 2 24U enhanced model
50 to 100 employees
PDB
15
MicroDC Typical Configuration(2) Typical Configuration 3
42U basic model 100 to 150 employees
CCU
PDB
UPS
Battery
AR
Server
Switch
CCU
PDB
UPS
Battery
AR
Server
Switch
Storage
CCU
UPS
Battery
AR
Server
Switch
Typical Configuration 4 42U storage model 100 to 150 employees
Typical Configuration 5 42U computational model
100 to 150 employees
16
Features Solution Solution Value
24U basic model
Less than 50 employees
Cable and wireless networks, public servers,
and device management
Simplified maintenance
24 U MicroDC
Deploy the AR2220 and S5728 and support the AC, FW, and VoIP
value-added functions.
Deploy one RH2285 public server and allow for preinstallation of
the integrated management software, operating system, and file
sharing.
Offer local alerting and centralized management functions.
Free of profession IT personnel and the establishment of professional
equipment rooms
E2E preintegration and one-in-one delivery
Quick deployment of IT facilities and convenient migration of IT
hardware resources
24U enhanced model
50 to 100 employees
Basic office network and office applications
Full utilization of IT resources due to tight
budgets
24 U MicroDC
Deploy the AR2220, S5728, and S3752 and support the AC, FW,
and VoIP value-added functions.
Deploy two RH2285 V2 servers and preinstall the integrated
management software, operating system, file sharing, AD, and DNS,
and provide Exchange and FusionSphere virtualization platforms.
Offer local alerting and centralized management functions.
Free of profession IT personnel and the establishment of professional
equipment rooms
E2E preintegration and one-in-one delivery
Quick deployment of IT facilities and convenient migration of IT
hardware resources
MicroDC Sales Strategy
17
Features Solution Solution Value
42U basic model
100 to 150 employees
Mature enterprise operating model and
improved self-defined service system
Full utilization of IT resources and high
expansion capability due to tight budgets
42 U MicroDC
Deploy the AR2220, S5752, S3752 and S3728 (PoE) and support the AC,
FW, and VoIP value-added functions.
Deploy three RH2285 servers and preinstall the integrated management
software, operating system, file sharing, AC, DNS, and DHCP, allow for
installation of Exchange and SharePoint file management systems, and
support migration of existing service applications to the MicroDC platform.
Offer local management and centralized management functions.
E2E preintegration and one-in-one delivery
Unified management, convenient O&M, and high resource
utilization
Quick deployment of IT facilities and convenient migration of IT
hardware resources
42U storage model
Add the following requirement in addition to
those proposed by SMBs:
High data security and large storage space
Add the following functions in addition to those provided for SMBs:
Allow for installation of the CommVault archiving and backup software to
secure local data.
One SAN storage device providing 20 TB of storage space for storing
business-critical data; a maximum of 36 TB of storage space available
E2E preintegration and one-in-one delivery
Unified management, convenient O&M, and high resource
utilization
Quick deployment of IT facilities and convenient migration of IT
hardware resources
MicroDC Sales Strategy
18
Features Solution Solution Value
42U computational model
Adding the following requirement in addition
to those proposed by SMBs:
High computing capability and system
stability
Add the following functions in addition to those provided for SMBs:
Deploy one RH2285 servers and three RH2288 computing servers.
Allow for installation of the archiving and backup CommVault
software to secure local data and allow for installation of DSWare
virtualization cluster for fully using limited IT resources.
E2E preintegration and one-in-one delivery
Unified management, convenient O&M, and high resource
utilization
Quick deployment of IT facilities and convenient migration of
IT hardware resources
MicroDC Sales Strategy
19
Vendor Huawei SI Equipment Room Facility Provider
IT Infrastructure Provider
ICT Equipment Provider
Product Name MicroDC Branch Office Solution Branch Office Solution Branch Office Solution Fusion Architecture Integrated
Machine
Equipment Room Facility Layer
• Preintegrated with power supply and distribution, environmental monitoring, and cabling
Simple integration cabinets, cooling,
management, monitoring series solutions
None None
ICT Infrastructure Layer
•Preintegration and tuning of mature HUAWEI servers, storage, security, networks, and virtualization platforms
Simple integration None
• Integration solution that adopts tower severs or blade servers; backup solution; diverse security management and access control for PCs, portable computers, and printers
• Fusion solution, integration storage server networks, middleware, virtualization, management software, PBX, and 30-channel or less video surveillance
Management Layer
Unified management of multi MicroDC •Environment monitoring and ICT equipment one-in-one monitoring and operation based on site •Management simply, operation efficiency
Unable to provide unified management
• Unified management of equipment room facilities
• Unified management and monitoring not involved
• Unified network management of access routers
• Server connection to central equipment rooms
Assessment Result ★★★★★ ★★★ ★★★ ★★★ ★★★★
MicroDC Competitive Analysis
20
Shops of retail group Transit stations/call center of logistics industry
Schools of regional education Small hospitals of regional healthcare
Chain hotels
TV station of media industry
Business hall of bank branches oil & gas acquisition site of energy industry SME
MicroDC provides a open hardware and software platform for branches,Flexibly supports branch applications
for various industries and scenarios
MicroDC Sales Scenarios
21
Customer requirements and challenges
The ICT system of the Lisbon branch needs to be established rapidly to
support the OA office and operation.
Device purchasing and model selection are difficult at overseas, and
system design needs to meet international standards.
Lack of professional IT build and maintenance personnel.
MicroDC solution
Provides a set of ICT system, including the server, network, wireless
access, unified communication, power supply and distribution, and
environment monitoring.
Provides end-to-end services, such as plans, design, and delivery testing.
Implements unified management and simple maintenance for equipment
room facilities and ICT devices.
Customer benefits
Reduces the rollout time of the ICT system from several months to 1
week, meeting service requirements rapidly.
Resolves difficulties in plans, design, and overseas purchasing and device
model selection, focusing on core services.
Simplifies O&M and management, saving O&M costs by 50%.
Bank of China, Portugal Branch
22
Click to add Title 4 UPS
Contents
Click to add Title 1 Huawei DataCenter Overview
Click to add Title 2 MicroDC
Click to add Title 3 IDS1000/2000
23
Strategy
Opportunity
Application scenarios:
• Cable distribution room
• DC of small-and-medium enterprises
• Work stations of small-and-medium
enterprises
Application scenarios:
• Large internet IDC
• Information ports/bases
• Trusted management
• Trade centers
IDS2000-S
IDS2000-M&S
Application scenarios:
• 18 racks /IT container
• 3.5-21kW/rack
• Total Cap.≥400kW
Application scenarios:
• 4-10 rack/container
• 5-7.5kW/rack
• Total Cap.≤100kW
IDS1000-C
IDS1000-A
Application scenarios:
• Support high efficiency
of 94% at 50% rated
load and 93% at 25%
rated load UPS
> 2 Billion Population
Off-grid or poor grid
> 10 times of optimized power system > 0.6 Million Sites
OPEX of traditional dual D.G. power solution
Renewable energy requirement increasing (yearly)
> 30%
Facilities Sales Opportunities & Strategy
24
IDS1000-A IDS1000-C IDS2000-S IDS2000-M IDS2000-L
5 Solutions
4 Core
products
4 Platforms Flexible architecture
Precision cooling
Smart management
Efficient power supply
and distribution
UPS&PDF Precision AC
Chilled water AC
(Row-level)
Air-cool AC
Software platform + Hardware
NetEco® DCIM
UPS PDF
Consulting Architect Design
Indoor scenario: IDS2000 Modular data centers Outdoor scenario: IDS1000 Container data centers
Rack system
containment Rack
Facilities Family
25
Modular data center Container data center
Modular design, fast deployment
Intelligent & unified management
Professional consulting & design,
Highly efficient & reliable systems
• High efficiency: PUE<1.5
• TCO Saving ≥30%
• Space Saving ≥50%
• Fast deployment: only 14 weeks
All in one Cluster Small Medium Large Power
system
Cooling
system
Cabinet
system
Management
system
Core component
Intelligent
ICT DC Energy Efficiency Specialist
Efficient
Flexible High efficiency modular DC of China
mobile southern base
Container & Modular DC Key Selling Points
26
Containerization is a more thorough modular construction mode
Fast Deployment Gallop at the head, seize the
opportunity Flexible
Expansion Grow with your business
High Density Leading the trend, future -proof
Smart Management Easy to monitor and manage, rest at ease
Cost Saving Less initial investment and
operation cost
Containerization Fit New DC Construction Trend Well
27
Small DC
Medium-large
DC Modular
Medium-large
DC
Low-density
Small DC
Fast Solution 4-10 rack/container
5-7.5kW/rack
Total Cap.≤100kW
18 rack /IT container
3.5-21kW/rack
Total Cap.≥400kW
Standard
3-container
Cluster
Deployment
Independent power/cooling container,
coping with indoor existing equipment
20ft 40ft
Customized
solution
Multi-function Container: Special DC solution, include special functions like office, living
Office
Container Living
Container
Cluster: Flexible combination by IT container, power container and cooling container
All-in-one: One container integrate air conditioning, power supply system etc.
General Introduction of IDS1000 Product Family
28
IBM PMDC (6KW) IBM PMDC(14KW/22KW) IDS1000
Layout Single row, parallel to length of the tank (weight
shift, there are security risks)
Single row, parallel to length of the tank
(weight shift, there are security risks)
3-departments with hot and cold air
containment. Symmetrical layout of
Racks vertical to length of container
UPS back time 10min(TIER II) 10min(TIER II) 15min(TIER III standard)
Back time for cooling Install cooling system on site, no storage. Stop
cooling after power failure.
Install cooling system on site, no storage.
Stop cooling after power failure.
Refrigeration system with a storage tank,
can support a 15 - minute backup after
power failure
Cooling
Overhead air supply with water cooling system on
top; water-cooled module with vortex fan;
galvanized pipe + soft tube (water pipes on top of
the cabinets, once leak, serious damage to the
equipment)
Horizontal air supply, backplate cooling
design with cooling system on rack door
(high cost, cabinet -level liquid cooling
without cooling backup, once fail,
servers down)
In row air conditioner; stainless and
seamless steel pipe and soft pipes laid at
bottom
Maintaining space Cabinet sliding installed, need to pull out for
maintenance, not convenient
Cabinet sliding installed, need to pull out
for maintenance, not convenient 914mm(front),610mm(rear)
One stop solution or
not
Only provide IT or Power solution, need support of
cooling or power supply from customer or other
suppliers
Only provide IT or Power solution, need
support of cooling or power supply from
customer or other suppliers
One stop solution
IDS1000 Competitive Analysis with IBM
29
HP POD IDS1000
Container size 41.5’×8’×9.6’(not standard shipping container) 40’×8’×9.6’
Layout
Single row, parallel to length of tank (weight shift, there are security
risks)
3-departments with hot and cold air containment.
Symmetrical layout of Racks are vertical to length of
container
Power, fire fighting and monitoring system are placed outside the
container
Power, fire fighting and monitoring system are placed
inside container
cooling Overhead air supply with water cooling system on top; water-cooled
module with vortex fan; galvanized pipe + soft pipes (water pipes on
top of the cabinets, once leak, serious damage to the equipment)
Row in air conditioner, stainless and seamless steel pipe
and soft pipes laid at bottom
Power supply Power for each parts individually. PDF+ Intelligent PDU Dual redundant design, PDF+ Intelligent PDU
wiring Wiring at bottom, no slot, hard for maintenance Wiring on top, power cable and signal cable separated
to avoid EMI
Maintenance space 914mm(front), 412mm(rear), have to maintain outside container at
rear 914mm(front),610mm(rear)
One stop solution or not Only provide IT and Power solution, need support of cooling from
customer or other suppliers One stop solution
TIER level ≤ TIER II ≥TIER II
IDS1000 Competitive Analysis with HP
30
Cluster container DC solution, IT container can be easily expanded
Intelligent management platform-NetEco, access control system and Video
subsystem
2N redundancy design and modular design
Integrated All-In-One IDC solution and Standard 40ft ISO container
Security hierarchy design
High availability and Scalability
Fast deployment
High Security,fast deployment
High availability and smooth expansion
High density for various customers’ requirements/
Challenges & demands
Huawei solution
Benefit to customer
Vert is planning to build a new IDC data center,need fast deployment ,
smooth expansion for future development.
Container Data Center for Vert IDC
31
Modular Datacenter Traditional Datacenter
Compared with the traditional DC,modular DC has more advantages
Complex engineering,long term construction,average
2 years Simple engineering,short period construction
1~3 months
One-time construction ,large Initial investment ,low ROI
risk of over-investment
Flexible structure,deploy in phases,avoid
over-investment
Fixed infrastructure structure,unscalable,can’t meet the
needs of business development
Smooth scalable according to needs of business
development
Low infrastructure utilization,high powe consumption,
PUE>2.5 High infrastructure utilization,low power consumption
PUE< 1.6
Subsystem cross-management caused hardly
maintenance, relay on manual inspection ,high
cost of O&M
Subsystem separately O&M interface , realize
decentralized control、 unified management ,
reduce O&M
Traditional DC VS Modular DC
32
IT load:1~4.5kW IT load:1~132kW ITload:>132kW
IDS2000-S
Small DC
IDS2000-M
Medium DC
IDS2000-L
Large DC
Infrastructure unified management platform NetEco support solutions smooth scale, cross-
domain management Huawei IDS2000 solutions meet all different indoor application scenarios
NetE
co
Soluti
on
Switch
Switc
h
CCU CCU CCU CCU RS4
85
RS4
85 RS4
85
RS4
85
Modula
r 1
Modula
r n
NetEco
Switch
PDF A/C UPS ATS Cameral Smoke Temp.
Water-immersion Access
FE FE
PDF A/C UPS ATS Cameral Smoke Temp.
Water-immersion Access
Huawei Indoor Modular DC Solutions -- IDS2000 Series
33
Application scenarios:
• Cable distribution room
• DC of small-and-medium
enterprises
• Work stations of small-and-medium
enterprises
Available services:
• 1000-desktop cloud
• Deployment of less than 150 1U
servers
Deployment scale:
• One to five server cabinets
• 1 to 10 kW IT equipment
• Areas of less than 20 m²
Applications—IDS2000-S Series Small DC
34
Application scenarios:
• Communication operation centers
• DC of large-and-medium finical
agents
• High-performance computing
• Users of all industries
Available services:
• 2000-20000+desktop cloud
• deployment of less than 1000 1 U
servers
Deployment scale:
• 4 to 28 server cabinets
• 10 to 250 kW IT equipment
• Areas of 30 to 100 m² Core module: dual/single-row packing
Containment channel and flexible combination and evolution
Applications—IDS2000-M Series Medium DC
35
Flexible matching existing room update scenarios
Application scenarios:
• Large internet IDC
• Information ports/bases
• Entrusted management
• Trade centers
Available services:
Development of 1000 to 5000 1 U servers
Deployment scale:
• 20 to 1000 server cabinets
• 250 kW to 1 MW IT equipment
• Areas of 100 to 4000 m²
n DC modules + power supply module + outdoor cold source
module + decoration + fire control
Applications—IDS2000-L Series Large DC
36
Low power consumption & high efficient
• Universal modular structure & design support
various cutting-edge techs ,reduce PUE, realize
green DC
• PUE low to 1.3 ,energy saving 30~50%
Flexible expansion
• Modular & standard interface components making
modular sub system, realize deploy on demand and
scalable
• Smooth upgrade power density: 3-21kW per cabinet
IDS2000
Intelligent management
• Open and uniform monitoring and management of
infrastructures
• Interworking with the service layer and high availability
Quick deployment
• The deployment period is 8 to 12 weeks and is
shortened by 50%.
• Only a 2.8 m (9.19 ft) net height is required and the high
support floor is not required.
Huawei IDS2000 Highlights Summary
37
Benefits for customer
Supports online smooth upgrade of cabinet quantity.
The modulization UPS and N+X parallel redundancy installation ensures stable running and high
reliability.
The power density of a single cabinet is up to 9 kW.
Energy efficiency is available by making most of natural cooling sources. The capital expenditure
(CAPEX) is reduced by 35%.
Huawei solutions
The number of cabinets supported by a single module is increased from eight to 28.
The modular UPS is used to meet requirements of the power supply system. In this
way, dynamic growth of the capacity is available based on service development.
The dry cooler outdoor water chiller solution is used to improve the density. Power
consumption is reduced by making most of natural cooling sources.
Customer requirements and challenges
Supports online smooth upgrade of cabinet quantity.
The input power supply architecture is evolved from 280 V to 480 V to expand UPS capacity
online.
Reduces the floor area of the outdoor water chiller to a maximum based on the requirements of
outdoor water chilling air conditioners.
CANTV Modular DC in Venezuela
38
Click to add Title 4 UPS
Contents
Click to add Title 1 Huawei DataCenter Overview
Click to add Title 2 MicroDC
Click to add Title 3 IDS1000/2000
39
UPS8000-D
40-320kVA
30-800kVA
200-600kVA
Small
Medium
Large
1-20kVA
UPS2000-G
UPS5000-E
UPS5000-A
RT Small Power UPS Modular UPS Tower transformerless UPS Tower transformer-based
UPS
Huawei UPS Series
40
UPS8000-D (200-600kVA) UPS2000-G (1-20kVA) UPS5000-A (30-800kVA)
Small datacenter, ATM, office,
monitor equipments, etc.
Medium and large datacenter,
mall, business office etc.
Industrial automation
device
UPS5000-E (40-320kVA)
UPS Sales Scenarios
41
• passed 100% rigorous
acceptance test
• High efficiency of up to
96%
• Powerful service platform
Huawei UPS has been
shortlisted for CUCC
UPS2000-G UPS5000-E UPS8000-D UPS5000-A
1-20kVA 40-320kVA 30-800kVA 200-600kVA
Reliable
Convenient
Intelligent Intelligent battery management
Key components pre-alarm, 1400+ test
Efficient 96%@40% load, 320kVA/cabinet
Modular design, online expansion &
maintenance
UPS Rack Key Selling Points
42
HUAWEI UPS2000G APC SURT Emerson Adapt Eaton DX RT Value
Input voltage range 80~280v 160~280v 228-478v 120-274v
Extend the battery life
Input Frequency Range 40-70Hz 45-65Hz 40-70 40-60
Input Power Factor 0.99 0.99 0.99 0.99
Output Power Factor 0.9 0.8 0.9 0.9
Efficiency 94.5% 94% 94% 92% Reduce OPEX
Weight 35 68 35 38 Reduce the installation
Space Dimensions 130*430*650 263*432*773 435*750*130 442*856*130
Parallel operation
capacity 4 3+1 2+1
More reliable Surge and lightning 6kV/2ohm 2KV/2ohm
2KV/2ohm
2KV/2ohm
Overload capacity 125% overload for 5 min
150% overload for 1min 125% overload for 5 min
150% overload for 1min 125% overload for 60 s
135% overload for 30s
More Reliable, More saving ,Smaller
UPS2000G Competitive Analysis with Other Vendors
43
As a multinational carrier, Qtel services more than 660
million users in the Middle East, North Africa, Southeast
Asia and Asian subcontinent.
WATANIYA is the sub network of Qtel in Maldives.
UPS5000-E 160KVA * 1
3+1 module redundancy in one cabinet, achieves reliable power
supply with low power loss in redundancy.
Hot-swap Power, control, bypass, monitor are all modular design,
and can be replaced in 10 min.
Central power supply, need redundant configuration
Rapid maintenance and convenient expansion
Challenge and requirements
HUAWEI UPS Solution
Project Background
As the sub network of Qtel in Maldives, WATANIYA needs UPS to
protect their core equipment from power failure.
Huawei Provides Protection to Subnet of Qtel
Copyright©2012 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product
portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive
statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time
without notice.