HGCM System2

Post on 12-Apr-2017

180 views 0 download

Transcript of HGCM System2

HARD GELATIN CAPSULE MACHINES SCADA ProjectDesigned by: Ahmed KamalAutomation Engineer at Jedco International Pharmaceutical

What is Hard Gelatin Capsule ?

Hard Gelatin Capsule Machine

More about the machine Allen Bradley control system DeviceNet communication system 10 main heaters and HVAC system Hydraulic system Pneumatic system Mechanical system, and Pumps Electrical motors, Instruments, and

Sensors

Why SCADA project needed?

Production followed up by Management level

Parameters monitored and analyzed by Engineering level

Fault tracking Save manual data recording time HVAC calculations

Project Hardware AllenBradley -- SLC 5/04 & 5/05

controller StarTech Netrs232 ( Rs232 to Ethernet )

Adapter Ethernet Switches

Project Softwares RSLinx Gateway Microsoft Excel Visual Basic for applications StarTech IP-Extender

Manager

Project Objectives Remote monitoring and recording for

machines status and parameters. Print monthly report about break down

time Daily data presentation Archiving data

Reason behind using Excel Low cost instead of using that software:

FactoryTalk. Cristal Report. Sequel Database.

High programing capabilities. More popular. Unlimited Tags

Monitoring Screens • Three Machines• Sections

• General Informations• Machines Production• HVAC Parameters• Raw Material

Parameters• Process Heaters• HVAC Calculations• Notifications lamps

Monitoring Screens • Process Parameters

Charts

• Daily based• Show Set value• Show Present value• Adjustable Scale• Excellent visualize

Printable Charts• Save Ink• No need for colored

printer

Machine speed chart• Set and present value• Set value manipulation

HVAC Charts

• AHU Speed• AHU Humidity set value• AHU Humidity present

value

HVAC Charts

• Humidity Ratio• Calculated from

• AHU Temperature• AHU Humidity• Air Pressure

HVAC Charts

Production Chart• Production Counter• Reset once per shift

Alarm Report

• Alarm Time• Alarm Code• Alarm Message• For maintenance

schedule• To evaluate

maintenance crew

Breakdown Report• Breakdown duration per

working shift• Breakdown counter

Control Room

• Data Exporting• Start/Stop Recording• Data Archiving

Control Room

• Machine Time synchronization

• Record timer• Used passwords

Passwords

Data resorting

• Restore Operating parameters

• Restore by row number• Operators evaluation

Data resorting

• Restore Operating parameters

• Restore by row number• Operators evaluation

Recording

• Continuous Recording• Record every 30 minute• Classified by working

shifts• Record all monitored

parameters• No effect on opened

sheets

Thanks for reading