Geotech 1st Legycture

Post on 05-Mar-2016

215 views 0 download

description

gh

Transcript of Geotech 1st Legycture

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 1/44

Brief Introduction to

eotec n ca ng neer ng ro ess on

Prof K. RajagopalDepartment of Civil Engineering

 e-mail: gopalkr@iitm.ac.in

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 2/44

Apartment building in Kakinada – suddenly sunk into the ground 

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 3/44

Taj Mahal, Agra – one of the most visited places in the World 

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 4/44

Taj Mahal, sitting strong one an s o r ver amuna n

spite of severe erosion and

earthquakes. Inclination of

minarets has not changedsince its construction in the

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 5/44

Brigade Holiday Inn, OMR, Chennai

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 6/44

Ol 1 and 2

M

a

s orey

Residential

Buildings

a b

a Secant piles to

I

P

ur 

support vertical

excavation (act Water table

m

 

walls)

a

Cross-Sectional view of

approx.

12m

Plan view of the construction site (schematic - not to scale)

 proposed construction

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 7/44

 

October 2011)

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 8/44

Close-up view of excavation – notice the secant piles on left side – on right sidehollow steel pipes and 13m long soil nails driven to stabilize excavation

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 9/44

Sand bags dumped to prevent flow of soil from

ground on right side excavation

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 10/44

Support of deep excavation using pre-stressed

grou e anc ors a enna

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 11/44

Construction of Ghat road at

ana a urga emp e ayawa a

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 12/44

 of road 

Narrow stretch on the Ghat road

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 13/44

View of 2-tier Wall from Krishna River 

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 14/44

Excavation for the 4-tier wall

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 15/44

ALIGNMENT OF TIER 1 FOR 4 TIER WALL

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 16/44

Top view of the completed 4-tier wall -

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 17/44

Additional Parking space gained at the top of the hill

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 18/44

Machu Pichu, Peru

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 19/44

Series of terraces to reach to the top

Terraces served to stabilise the hill slopes, space

for agriculture, townships, obstruct the enemy

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 20/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 21/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 22/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 23/44

Kansai International Airport

artificial island away from land

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 24/44

• Air port is three miles (5 km) off

the coast of Japan in Osaka bay

• rea o ar c a s an , acres

(approximately 5.1x106

sq. m.)almost double the size of IITM campus

 meters)

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 25/44

•Seven years of construction time

•9.2 billon dollar budget (1 billion = 1,000

m on

’ -

the longest building and bridge of its

n n e mos mass ve pu c wor s

project of the 20th century.

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 26/44

-

Overall view of the sea

wall

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 27/44

CONSTRUCTION PROCESS

Three main stages of the island construction Remediation (strengthening) of the seabed,

,

Fill to construct the island

While the fill is placed, airport buildings started coming up.

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 28/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 29/44

Barge bringing soil all the way from China !!!

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 30/44

Pre-consolidation Methods

Sand drains-

Vacuum assisted pre-consolidation

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 31/44

 

surcharge fill

sand columns

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 32/44

PVDs for pre-consolidation

Corrugated plastic corefor drainage

L

Geotextile filter 

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 33/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 34/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 35/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 36/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 37/44

Mangalore Refineries and Petroleum Limited Complex

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 38/44

Factory buildings on top of the slope

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 39/44

Entire height of slope stabilised using soil nails

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 40/44

Construction of an approach road to an RoB

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 41/44

 Hindustan Zinc, Vizag

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 42/44

Completed Pond in Service

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 43/44

7/21/2019 Geotech 1st Legycture

http://slidepdf.com/reader/full/geotech-1st-legycture 44/44

Failure of a road embankment due to deep seated rotation