Geotech 1st Legycture
-
Upload
rudrathecivil -
Category
Documents
-
view
215 -
download
0
description
Transcript of Geotech 1st Legycture
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 1/44
Brief Introduction to
eotec n ca ng neer ng ro ess on
Prof K. RajagopalDepartment of Civil Engineering
e-mail: [email protected]
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 2/44
Apartment building in Kakinada – suddenly sunk into the ground
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 3/44
Taj Mahal, Agra – one of the most visited places in the World
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 4/44
Taj Mahal, sitting strong one an s o r ver amuna n
spite of severe erosion and
earthquakes. Inclination of
minarets has not changedsince its construction in the
’
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 5/44
Brigade Holiday Inn, OMR, Chennai
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 6/44
Ol 1 and 2
M
a
s orey
Residential
Buildings
a b
a Secant piles to
I
P
ur
support vertical
excavation (act Water table
m
R
walls)
a
d
Cross-Sectional view of
approx.
12m
Plan view of the construction site (schematic - not to scale)
proposed construction
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 7/44
October 2011)
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 8/44
Close-up view of excavation – notice the secant piles on left side – on right sidehollow steel pipes and 13m long soil nails driven to stabilize excavation
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 9/44
Sand bags dumped to prevent flow of soil from
ground on right side excavation
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 10/44
Support of deep excavation using pre-stressed
grou e anc ors a enna
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 11/44
Construction of Ghat road at
ana a urga emp e ayawa a
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 12/44
of road
Narrow stretch on the Ghat road
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 13/44
View of 2-tier Wall from Krishna River
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 14/44
Excavation for the 4-tier wall
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 15/44
ALIGNMENT OF TIER 1 FOR 4 TIER WALL
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 16/44
Top view of the completed 4-tier wall -
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 17/44
Additional Parking space gained at the top of the hill
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 18/44
Machu Pichu, Peru
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 19/44
Series of terraces to reach to the top
Terraces served to stabilise the hill slopes, space
for agriculture, townships, obstruct the enemy
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 20/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 21/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 22/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 23/44
Kansai International Airport
’
artificial island away from land
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 24/44
• Air port is three miles (5 km) off
the coast of Japan in Osaka bay
• rea o ar c a s an , acres
(approximately 5.1x106
sq. m.)almost double the size of IITM campus
meters)
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 25/44
•Seven years of construction time
•9.2 billon dollar budget (1 billion = 1,000
m on
’ -
the longest building and bridge of its
n n e mos mass ve pu c wor s
project of the 20th century.
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 26/44
-
Overall view of the sea
wall
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 27/44
CONSTRUCTION PROCESS
Three main stages of the island construction Remediation (strengthening) of the seabed,
,
Fill to construct the island
While the fill is placed, airport buildings started coming up.
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 28/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 29/44
Barge bringing soil all the way from China !!!
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 30/44
Pre-consolidation Methods
Sand drains-
Vacuum assisted pre-consolidation
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 31/44
surcharge fill
sand columns
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 32/44
PVDs for pre-consolidation
Corrugated plastic corefor drainage
L
Geotextile filter
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 33/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 34/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 35/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 36/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 37/44
Mangalore Refineries and Petroleum Limited Complex
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 38/44
Factory buildings on top of the slope
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 39/44
Entire height of slope stabilised using soil nails
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 40/44
Construction of an approach road to an RoB
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 41/44
Hindustan Zinc, Vizag
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 42/44
Completed Pond in Service
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 43/44
7/21/2019 Geotech 1st Legycture
http://slidepdf.com/reader/full/geotech-1st-legycture 44/44
Failure of a road embankment due to deep seated rotation