CONTENTS1. INTRODUCTION2. COAL HANDLING PLANT3. ASH HANDLING PLANT4. ESP5. BOILER6. STREAM TURBINE7. TURBO GENERATOR8. WATER TREATMENT PLANT9. TRANSFORMER10. CONTROL ROOM

LOCATION

Ideally on the left bank of Chambal River at Up Stream of Kota Barrage

The 220 KV GSS is within ½ Kms.

LAND

Land measuring approx. 250 hectares was required for the project in 1976

COAL Coal India limited supply coal from its coal producing subsidiaries BCCL, SECL & ECL through railway wagons

WATER The source of water for power station is reservoir formed by Kota Barrage on the Chambal River

K.T.P.S. IS DESIGNED IN FIVE STAGES1

STAGE I

2x110 MW

STAGE Il

2x210 MW

STAGE Ill

1x210 MW

STAGE IV

1x195 MW

STAGE I1x195 MW

Net Power Generation = 1240 MW

2 3

4

5

WORKING OF KSTPS

POWER SYSTEM COMPONENTS• ,

220 kV Power Plant

Generation

ResidentialCustomer

Commercial/IndustrialCustomer

ResidentialCustomer

DistributionPole

UrbanCustomers

Primary Distribution

66 kVTransmission

Distribution Transformer(11/0.415 kV)

Secondary Grid(66/11 kV)

Primary Grid (220/66 kV)

Secondary Distribution

Underground Cable

To Other 66KvSubstations

Primary Transmission(132/220/400/765KV)

Secondary Transmission(66/132KV)

CBX’mer(11/220kV)Sending end SS Bus-bar

Bus-bar Steel Tower

CB

V V Nagar

GCET

2. COAL HANDLING PLANT

• This plant have 3 parts...A. Wagon unloading system.B. Conveying belt system.C. Crushing system.

IMAGE OF COAL HANDLING PLANT

COAL LOADED BY TRAIN

• SOURCE OF COAL : COAL INDIA LTD. BCCL,SECL & ECL• MEANS OF TRANSPORTATION: - RAILWAY WAGONS • TYPE OF COAL : BITUMINOUS TAKEN TO COAL MILLS THROUGH CONVEYOR BELTS. CRUSHED INTO POWDERED FORM IN COAL MILLS. WITH THE HELP OF PRIMARY AIR FANS IT IS TAKEN TO BOILER.• COAL HANDLING PLANTCOAL HANDLING PLANT

A. Wagon unloading system

• Unload the coal from wagon to hopper.

• Hopper allows to pass coal pieces ≤ 200mm

• From hopper coal fall on vibrator which is supported by roller.

C.Conveying system

• Belt are used to convey coal from coal handling plant to furnance.• Specification:-

– Belt width : 1400mm– Speed : 2.2m/sec– Total install power : 360kw – Capacity : 1350/750 ton/hr– No. of conveyor: 38

B. Crushing system

5. BOILER with FURNANCE

four part is connected with the boiler & furnance section

1. Water treatment plant.2. Ash handling plant.3. ESP(Chimeny)4. Turbine section.

8. WATER TREATMENT PLANT

• SOURCE OF WATER :- CHAMBAL RIVER

W.T.P. DIVIDED IN TWO PARTS :-

FILTERATION WATER PLANT DEMINERALISED WATER PLANT

CHART OF W.T.P

IMAGE OF D.M. WATER PLANT

ASH HANDLING PLANT

ASH HANDLING PLANT

ASH HANDLING PLANT

This plant can be divided into three sub plants as follows :-

1)Fuel and Ash Plant:-

2)Air and Gas Plant:-

3) Ash Disposal and & Dust Collection Plant:-

4. ELECTROSTATIC PRECIPITATOR

WORKING OF PRECIPITATOR

6.TURBINE

7.TURBO GENERATORDesigned for continuous operation at the

rated output.Directly coupled with steam turbine, rotated

at high speed of 3000 RPM.Two major parts:- (i) Stator (ii) RotorMajor parts of stator are (i) Stator frame. (ii)Stator core. (iii)Stator bars. (iv)Stator windings.

Working of turbine & generator:-

STEAM

TURBINE

MECHANICAL ENERGY

GENERATOR

ELECTRICAL ENERGY

8.Cooling System• In KSTPS hydrogen cooling system is employed for generator

cooling.• Hydrogen is used because of its superior cooling properties & low

density.• Thermal conductivity of H2 7.3 times of air.

• Seal oil system are used in turbine for less friction in bearing.• Water cooling also used for any kind of fire.

10. Transformer

Various Transformers In KSTPS

– Generating Transformer– Unit Auxiliary Transformer (U.A.T.)– Station Transformer (S.T.)– Exciting Transformer– Earthing Transformer– Instrument Transformer

Generating Transformer

Specification of U.A.T.

11.SWITCH YARD

CIRUCIT BREKER

Minimum oil circuit breaker Sf6 circuit breaker

MAIN CONTROL ROOM

• This room is control every plant…1) Fan control desk.2) Fuel control desk.3) Steam & water desk.4) Turbine desk.5) Generator control panel.