Gajendra rathore
-
Upload
gajendra-rathore -
Category
Business
-
view
415 -
download
2
Transcript of Gajendra rathore
A PRACTICAL TRAINING
SEMINAR ON
KOTA SUPER THERMAL POWER STATIONSubmitted to
PRESANTED TO:-Miss.Akansha Vyas Mem
PRESANTED BY:-
Name-Gajendra RathoreBranch –E&CRoll no-10ERNEC035
WELCOME
CONTENTS1. INTRODUCTION2. COAL HANDLING PLANT3. ASH HANDLING PLANT4. ESP5. BOILER6. STREAM TURBINE7. TURBO GENERATOR8. WATER TREATMENT PLANT9. TRANSFORMER10. CONTROL ROOM
LOCATION
Ideally on the left bank of Chambal River at Up Stream of Kota Barrage
The 220 KV GSS is within ½ Kms.
LAND
Land measuring approx. 250 hectares was required for the project in 1976
COAL Coal India limited supply coal from its coal producing subsidiaries BCCL, SECL & ECL through railway wagons
WATER The source of water for power station is reservoir formed by Kota Barrage on the Chambal River
K.T.P.S. IS DESIGNED IN FIVE STAGES1
STAGE I
2x110 MW
STAGE Il
2x210 MW
STAGE Ill
1x210 MW
STAGE IV
1x195 MW
STAGE I1x195 MW
Net Power Generation = 1240 MW
2 3
4
5
WORKING OF KSTPS
POWER SYSTEM COMPONENTS• ,
220 kV Power Plant
Generation
ResidentialCustomer
Commercial/IndustrialCustomer
ResidentialCustomer
DistributionPole
UrbanCustomers
Primary Distribution
66 kVTransmission
Distribution Transformer(11/0.415 kV)
Secondary Grid(66/11 kV)
Primary Grid (220/66 kV)
Secondary Distribution
Underground Cable
To Other 66KvSubstations
Primary Transmission(132/220/400/765KV)
Secondary Transmission(66/132KV)
CBX’mer(11/220kV)Sending end SS Bus-bar
Bus-bar Steel Tower
CB
V V Nagar
GCET
2. COAL HANDLING PLANT
• This plant have 3 parts...A. Wagon unloading system.B. Conveying belt system.C. Crushing system.
IMAGE OF COAL HANDLING PLANT
COAL LOADED BY TRAIN
• SOURCE OF COAL : COAL INDIA LTD. BCCL,SECL & ECL• MEANS OF TRANSPORTATION: - RAILWAY WAGONS • TYPE OF COAL : BITUMINOUS TAKEN TO COAL MILLS THROUGH CONVEYOR BELTS. CRUSHED INTO POWDERED FORM IN COAL MILLS. WITH THE HELP OF PRIMARY AIR FANS IT IS TAKEN TO BOILER.• COAL HANDLING PLANTCOAL HANDLING PLANT
A. Wagon unloading system
• Unload the coal from wagon to hopper.
• Hopper allows to pass coal pieces ≤ 200mm
• From hopper coal fall on vibrator which is supported by roller.
C.Conveying system
• Belt are used to convey coal from coal handling plant to furnance.• Specification:-
– Belt width : 1400mm– Speed : 2.2m/sec– Total install power : 360kw – Capacity : 1350/750 ton/hr– No. of conveyor: 38
B. Crushing system
5. BOILER with FURNANCE
four part is connected with the boiler & furnance section
1. Water treatment plant.2. Ash handling plant.3. ESP(Chimeny)4. Turbine section.
8. WATER TREATMENT PLANT
• SOURCE OF WATER :- CHAMBAL RIVER
W.T.P. DIVIDED IN TWO PARTS :-
FILTERATION WATER PLANT DEMINERALISED WATER PLANT
CHART OF W.T.P
IMAGE OF D.M. WATER PLANT
ASH HANDLING PLANT
ASH HANDLING PLANT
ASH HANDLING PLANT
This plant can be divided into three sub plants as follows :-
1)Fuel and Ash Plant:-
2)Air and Gas Plant:-
3) Ash Disposal and & Dust Collection Plant:-
4. ELECTROSTATIC PRECIPITATOR
WORKING OF PRECIPITATOR
6.TURBINE
7.TURBO GENERATORDesigned for continuous operation at the
rated output.Directly coupled with steam turbine, rotated
at high speed of 3000 RPM.Two major parts:- (i) Stator (ii) RotorMajor parts of stator are (i) Stator frame. (ii)Stator core. (iii)Stator bars. (iv)Stator windings.
Working of turbine & generator:-
STEAM
TURBINE
MECHANICAL ENERGY
GENERATOR
ELECTRICAL ENERGY
8.Cooling System• In KSTPS hydrogen cooling system is employed for generator
cooling.• Hydrogen is used because of its superior cooling properties & low
density.• Thermal conductivity of H2 7.3 times of air.
• Seal oil system are used in turbine for less friction in bearing.• Water cooling also used for any kind of fire.
10. Transformer
Various Transformers In KSTPS
– Generating Transformer– Unit Auxiliary Transformer (U.A.T.)– Station Transformer (S.T.)– Exciting Transformer– Earthing Transformer– Instrument Transformer
Generating Transformer
Specification of U.A.T.
11.SWITCH YARD
CIRUCIT BREKER
Minimum oil circuit breaker Sf6 circuit breaker
MAIN CONTROL ROOM
• This room is control every plant…1) Fan control desk.2) Fuel control desk.3) Steam & water desk.4) Turbine desk.5) Generator control panel.
THANKS...ALL
GENTALMENTS