A PRACTICAL TRAINING SEMINAR ON KOTA SUPER THERMAL POWER STATION Submitted to PRESANTED TO:- Miss.Akansha Vyas Mem PRESANTED BY:- Name-Gajendra Rathore Branch –E&C Roll no- 10ERNEC035

Transcript of Gajendra rathore

Page 1: Gajendra rathore

A PRACTICAL TRAINING

SEMINAR ON

KOTA SUPER THERMAL POWER STATIONSubmitted to

PRESANTED TO:-Miss.Akansha Vyas Mem

PRESANTED BY:-

Name-Gajendra RathoreBranch –E&CRoll no-10ERNEC035

Page 2: Gajendra rathore

WELCOME

Page 3: Gajendra rathore

CONTENTS1. INTRODUCTION2. COAL HANDLING PLANT3. ASH HANDLING PLANT4. ESP5. BOILER6. STREAM TURBINE7. TURBO GENERATOR8. WATER TREATMENT PLANT9. TRANSFORMER10. CONTROL ROOM

Page 4: Gajendra rathore

LOCATION

Ideally on the left bank of Chambal River at Up Stream of Kota Barrage

The 220 KV GSS is within ½ Kms.

LAND

Land measuring approx. 250 hectares was required for the project in 1976

COAL Coal India limited supply coal from its coal producing subsidiaries BCCL, SECL & ECL through railway wagons

WATER The source of water for power station is reservoir formed by Kota Barrage on the Chambal River

Page 5: Gajendra rathore

K.T.P.S. IS DESIGNED IN FIVE STAGES1

STAGE I

2x110 MW

STAGE Il

2x210 MW

STAGE Ill

1x210 MW

STAGE IV

1x195 MW

STAGE I1x195 MW

Net Power Generation = 1240 MW

2 3

4

5

Page 6: Gajendra rathore

WORKING OF KSTPS

Page 7: Gajendra rathore

POWER SYSTEM COMPONENTS• ,

220 kV Power Plant

Generation

ResidentialCustomer

Commercial/IndustrialCustomer

ResidentialCustomer

DistributionPole

UrbanCustomers

Primary Distribution

66 kVTransmission

Distribution Transformer(11/0.415 kV)

Secondary Grid(66/11 kV)

Primary Grid (220/66 kV)

Secondary Distribution

Underground Cable

To Other 66KvSubstations

Primary Transmission(132/220/400/765KV)

Secondary Transmission(66/132KV)

CBX’mer(11/220kV)Sending end SS Bus-bar

Bus-bar Steel Tower

CB

V V Nagar

GCET

Page 8: Gajendra rathore

2. COAL HANDLING PLANT

• This plant have 3 parts...A. Wagon unloading system.B. Conveying belt system.C. Crushing system.

Page 9: Gajendra rathore

IMAGE OF COAL HANDLING PLANT

Page 10: Gajendra rathore

COAL LOADED BY TRAIN

• SOURCE OF COAL : COAL INDIA LTD. BCCL,SECL & ECL• MEANS OF TRANSPORTATION: - RAILWAY WAGONS • TYPE OF COAL : BITUMINOUS TAKEN TO COAL MILLS THROUGH CONVEYOR BELTS. CRUSHED INTO POWDERED FORM IN COAL MILLS. WITH THE HELP OF PRIMARY AIR FANS IT IS TAKEN TO BOILER.• COAL HANDLING PLANTCOAL HANDLING PLANT

Page 11: Gajendra rathore

A. Wagon unloading system

• Unload the coal from wagon to hopper.

• Hopper allows to pass coal pieces ≤ 200mm

• From hopper coal fall on vibrator which is supported by roller.

Page 12: Gajendra rathore

C.Conveying system

• Belt are used to convey coal from coal handling plant to furnance.• Specification:-

– Belt width : 1400mm– Speed : 2.2m/sec– Total install power : 360kw – Capacity : 1350/750 ton/hr– No. of conveyor: 38

Page 13: Gajendra rathore

B. Crushing system

Page 14: Gajendra rathore

5. BOILER with FURNANCE

Page 15: Gajendra rathore

four part is connected with the boiler & furnance section

1. Water treatment plant.2. Ash handling plant.3. ESP(Chimeny)4. Turbine section.

Page 16: Gajendra rathore

8. WATER TREATMENT PLANT

• SOURCE OF WATER :- CHAMBAL RIVER

W.T.P. DIVIDED IN TWO PARTS :-

FILTERATION WATER PLANT DEMINERALISED WATER PLANT

Page 17: Gajendra rathore

CHART OF W.T.P

Page 18: Gajendra rathore

IMAGE OF D.M. WATER PLANT

Page 19: Gajendra rathore

ASH HANDLING PLANT

ASH HANDLING PLANT

Page 20: Gajendra rathore

ASH HANDLING PLANT

This plant can be divided into three sub plants as follows :-

1)Fuel and Ash Plant:-

2)Air and Gas Plant:-

3) Ash Disposal and & Dust Collection Plant:-

Page 21: Gajendra rathore

4. ELECTROSTATIC PRECIPITATOR

Page 22: Gajendra rathore

WORKING OF PRECIPITATOR

Page 23: Gajendra rathore

6.TURBINE

Page 24: Gajendra rathore

7.TURBO GENERATORDesigned for continuous operation at the

rated output.Directly coupled with steam turbine, rotated

at high speed of 3000 RPM.Two major parts:- (i) Stator (ii) RotorMajor parts of stator are (i) Stator frame. (ii)Stator core. (iii)Stator bars. (iv)Stator windings.

Page 25: Gajendra rathore

Working of turbine & generator:-

STEAM

TURBINE

MECHANICAL ENERGY

GENERATOR

ELECTRICAL ENERGY

Page 26: Gajendra rathore

8.Cooling System• In KSTPS hydrogen cooling system is employed for generator

cooling.• Hydrogen is used because of its superior cooling properties & low

density.• Thermal conductivity of H2 7.3 times of air.

• Seal oil system are used in turbine for less friction in bearing.• Water cooling also used for any kind of fire.

Page 27: Gajendra rathore

10. Transformer

Page 28: Gajendra rathore

Various Transformers In KSTPS

– Generating Transformer– Unit Auxiliary Transformer (U.A.T.)– Station Transformer (S.T.)– Exciting Transformer– Earthing Transformer– Instrument Transformer

Page 29: Gajendra rathore

Generating Transformer

Page 30: Gajendra rathore

Specification of U.A.T.

Page 31: Gajendra rathore

11.SWITCH YARD

Page 32: Gajendra rathore

CIRUCIT BREKER

Minimum oil circuit breaker Sf6 circuit breaker

Page 33: Gajendra rathore

MAIN CONTROL ROOM

• This room is control every plant…1) Fan control desk.2) Fuel control desk.3) Steam & water desk.4) Turbine desk.5) Generator control panel.

Page 34: Gajendra rathore
Page 35: Gajendra rathore
Page 36: Gajendra rathore
Page 37: Gajendra rathore

THANKS...ALL