DISTRICT OFFICE AND OPERATION CENTER SPOE

Post on 30-Oct-2021

3 views 0 download

Transcript of DISTRICT OFFICE AND OPERATION CENTER SPOE

DISTRICT OFFICE

5

57

E BALL RD

S E

AS

T S

T

VERMONT AVE

E SOUTH AVEE WAGNER AVE

S S

TA

TE

CO

LLE

GE

BLV

D

S L

EW

IS S

T

OPERATION CENTER

AN

AH

EIM

BLV

D

E CERRITOS AVE

SITE ADDRESS:

1001 S EAST ST, ANAHEIM, 92805

SITE ENTRY

5

E BALL RD

S E

AS

T S

T

VERMONT AVE

E SOUTH AVE

S S

TA

TE

CO

LLE

GE

BLV

D

S L

EW

IS S

T

SITE ENTRY

SITE ADDRESS:

1411 S ANAHEIM

BLVD, ANAHEIM 92805

E CERRITOS AVE

S A

NA

HE

IM B

LV

D

FOR ADDITIONAL ABBREVIATIONS, SEE OTHER DISCIPLINE SHEETS. ABBREVIATIONS MAY VARY BETWEEN DISCIPLINES.

ABBREVIATIONS

@

A.F.F.A.C.ALUM.APPROX.ARCH.BLDG.C.J.CLG.CONC.C.M.U.CONT.D.G.DIA.DN.D.F.D.S.DWG.(E)EA.E.J.ELEC.ELEV.EQ.EQUIP.EXT.F.D.F.E.F.E.C.F.F.F.O.C.F.O.M.F.O.S.F.R.P.F.S.F.V.FT.GA.GALV.GYP.H.M.HORIZ.HT.INT.LAB.LAM. PLAS.LAV.MAX.MECH.MFR.MIN.MISC.M.O.NO./#N.T.S.O.C.O.F.C.I.

O.F.O.I.

O.H.O.L.F.P.H.P.L.R.RAD.REF.REQ'D.RM.R.O.SFSIM.SPEC.S.P.O.E.S.S.STRUCT.SYM.T.T.& G.T.O.C.T.O.D.T.O.P.T.O.S.T.O.W.TEMP.TYP.U.N.O.U.O.N.U.V.C.T.V.I.F.VERT.W/W.C.

ATCENTERLINE

ABOVE FINISH FLOORASPHALTIC CONCRETEALUMINUMAPPROXIMATELYARCHITECTBUILDINGCONTROL JOINTCEILINGCONCRETECONCRETE MASONRY UNITSCONTINUOUSDECOMPOSED GRANITEDIAMETERDOWNDRINKING FOUNTAINDOWNSPOUTDRAWINGEXISTINGEACHEXPANSION JOINTELECTRICELEVATOREQUALEQUIPMENTEXTERIORFLOOR DRAINFIRE EXTINGUISHER (WALL HUNG)FIRE EXTINGUISHER AND CABINETFINISH FLOORFACE OF CONCRETEFACE OF MASONRYFACE OF STUDFIBERGLASS REINFORCED PLASTICFLOOR SINKFIELD VERIFYFOOT OR FEETGAUGE OR GAGEGALVANIZEGYPSUMHOLLOW METALHORIZONTALHEIGHTINTERIORLABORATORYLAMINATED PLASTICLAVATORYMAXIMUMMECHANICALMANUFACTURERMINIMUMMISCELLANEOUSMASONRY OPENINGNUMBERNOT TO SCALEON CENTEROWNER FURNISHED CONTRACTOR INSTALLEDOWNER FURNISHED OWNER INSTALLEDOPPOSITE HANDOCCUPANT LOAD FACTORPANIC HARDWAREPROPERTY LINESTAIR RISERRADIUSREFRIGERATORREQUIREDROOMROUGH OPENINGSQUARE FEETSIMILARSPECIFICATIONSSINGLE POINT OF ENTRYSTAINLESS STEEL OR SERVICE SINKSTRUCTURALSYMMETRICALSTAIR TREADTONGUE AND GROOVETOP OF CURBTOP OF DECKTOP OF PARAPETTOP OF STEELTOP OF WALLTEMPORARYTYPICALUNLESS NOTED OTHERWISEUNLESS OTHERWISE NOTEDURINALVINYL COMPOSITION TILEVERIFY IN FIELDVERTICALWITHWATER CLOSET

APPLICABLE CODES & STANDARDS

GENERAL CODES

• 2019 CA ADMINISTRATIVE CODE (CAC), PART 1, TITLE 24 CCR• 2019 CA BUILDING CODE (CBC), PART 2, TITLE 24 CCR (2018 INTERNATIONAL BUILDING CODE VOLUMES 1-2 AND 2019 CA AMENDMENTS)• 2019 CA ELECTRICAL CODE (CEC), PART 3, TITLE 24 CCR (2017 NATIONAL ELECTRICAL CODE AND 2019 CALIFORNIA AMENDMENTS)• 2019 CA MECHANICAL CODE (CMC), PART 4, TITLE 24 CCR (2018 UNIFORM MECHANICAL CODE AND 2019 CALIFORNIA AMENDMENTS)• 2019 CA PLUMBING CODE (CPC), PART 5, TITLE 24 CCR (2018 UNIFORM PLUMBING CODE AND 2019 CALIFORNIA AMENDMENTS)• 2019 CA ENERGY CODE, PART 6, TITLE 24 CCR• 2019 CA FIRE CODE (CFC), PART 9, TITLE 24 CCR (2018 INTERNATIONAL FIRE CODE AND 2019 CALIFORNIA AMENDMENTS)• 2019 CA EXISTING BUILDING CODE (CEBC), PART 10, TITLE 24 CCR• 2019 CA GREEN BUILDING STANDARD (CALGREEN CODE), PART 11, TITLE 24 CCR• 2019 CA REFERENCE STANDARDS CODE (CRSC), PART 12, TITLE 24 CCR• TITLE 19 CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS• NFPA 101 - LIFE SAFETY CODE, 2015• AMERICANS WITH DISABILITIES ACT (ADA), TITLE II: ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36)

1. VERIFY DIMENSIONS, LOCATIONS OF EXISTING UTILITIES, AND CONDITIONS ON THE JOB SITE PRIOR TO THE START OF WORK OR PORTIONS OF THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES BETWEEN THE ACTUAL FIELD CONDITIONS AND THE CONSTRUCTION DOCUMENTS. EXISTING CONDITIONS ARE INDICATED AS A RESULT OF FIELD OBSERVATIONS, INFORMATION SHOWN ON AVAILABLE DOCUMENTS AND FIELD CONDITIONS AT THE TIME OF PREPARATION, AND ARE NOT GUARANTEED TO BE ACCURATE.

2. MATERIALS AND WORKMANSHIP SHALL COMPLY WITH GOVERNING CODES, ORDINANCES, REGULATIONS AND LAWS.

3. THE DESIGN ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS AND SCAFFOLDING IS THE RESPONSIBILITY OF THE CONTRACTOR.

4. WHERE CONFLICT OCCURS BETWEEN THE REQUIREMENTS OF LAWS, CODES, ORDINANCES, RULES AND REGULATIONS, THE MOST STRINGENT SHALL GOVERN.

5. DIMENSIONS SHOWN ON DRAWINGS SUPERSEDE SCALED DIMENSIONS.

6. DETAILS MARKED 'TYPICAL' SHALL APPLY IN SIMILAR CASES.

7. WHERE NO SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE IDENTICAL OR SIMILAR TO THAT INDICATED FOR LIKE CASES OF CONSTRUCTION OR PER COMMON INDUSTRY PRACTICE IF THERE ARE NO LIKE CASES.

8. PRIOR TO THE START OF WORK COORDINATE THE REQUIREMENTS OF THE TRADES INDICATED HEREIN AND THE REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS.

9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SUBDIVIDE THE WORK.

10. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS THAT THE WORK BE IN ACCORDANCE WITH TITLE 24, CALIFORNIA CODE OF REGULATIONS. SHOULD EXISTING CONDITIONS SUCH AS DETERIORATION OR NON COMPLYING CONSTRUCTION BE DISCOVERED WHICH IS NOT COVERED BY THE CONTRACT DOCUMENTS WHEREIN THE NEW WORK WILL NOT COMPLY WITH TITLE 24, CALIFORNIA CODE OF REGULATIONS, NOTIFY THE OWNER AND MAKE CORRECTIONS REQUIRED TO BRING THE NEW WORK INTO COMPLIANCE WITH THE CODE.

11. CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE MADE BY A WRITTEN CONSTRUCTION CHANGE DOCUMENT AND IF REQUIRED BY STATUTE, APPROVED BY THE AGENCY HAVING JURISDICTION, IN COMPLIANCE WITH THE GOVERNING CODES.

12. PROVIDE THE OWNER, THE OWNER'S REPRESENTATIVE, AND THE PROJECT INSPECTOR FULL ACCESS TO THE SITE AT ALL TIMES.

13. DIMENSIONS ARE TO GRID LINES, FACE OF CONCRETE, FACE OF CONCRETE MASONRY UNITS, AND FACE OF STUDS, UNLESS NOTED OTHERWISE.

14. CONTRACTOR'S SAFETY BARRICADES AND TEMPORARY FENCING SHALL PROTECT THE PUBLIC FROM CONSTRUCTION ACTIVITIES. THE SAFETY BARRICADE SHALL PROTECT AND SECURE THE CONSTRUCTION AREA. TEMPORARY FENCING SHALL BE PROVIDED TO PROTECT AND SECURE STORAGE YARDS. THE EXACT LOCATION OF SAFETY BARRICADE AND TEMPORARY FENCING SHALL BE DETERMINED BY THE CONTRACTOR AND APPROVED BY THE OWNER PRIOR TO INSTALLATION.

15. PENETRATIONS NOT SHOWN ON THE PLANS THAT REQUIRE CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH EXISTING OR NEW STRUCTURAL ELEMENTS ARE NOT ALLOWED UNLESS THE DETAILS HAVE BEEN REVIEWED BY THE OWNER OR THE PROJECT'S STRUCTURAL ENGINEER.

16. LOCATE ON-SITE UTILITIES BY OBTAINING AND PAYING FOR THE SERVICES OF A UTILITY LOCATER.

17. CONTACT AN UNDERGROUND UTILITY SERVICE TO CHECK PUBLIC UTILITIES PRIOR TO WORK IN A PUBLIC WAY.

18. WHERE CONFLICTS OCCUR IN THE DOCUMENTS, BID THE MORE EXPENSIVE ITEM.

19. SAFEGAURDS DURING DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH CBC CHAPTER 33 AND CFC CHAPTER 33.

GENERAL NOTES

1. CONSTRUCTION ACTIVITIES SHALL BE CONTAINED WITHIN FENCED OR BARRICADED AREAS. CONSTRUCTION ACTIVITIES THAT GENERATE DISRUPTIVE NOISE, ODORS, AND DUST TO BE SCHEDULED TO MINIMIZE DISRUPTION TO OCCUPANTS AT THE SITE AND NEIGHBORING PROPERTY. MODIFY THE PROJECT SCHEDULE AT THE OWNER'S REQUEST WHEN DISRUPTIONS CANNOT BE AVOIDED.

2. EXERCISE CAUTION IN EXCAVATING AND TRENCHING ON THIS SITE TO AVOID EXISTING DUCTS, PIPING, AND CONDUIT, AND TO PREVENT HAZARD TO EXISTING UNDERGROUND UTILITIES OR STRUCTURES. THE OWNER IS NOT RESPONSIBLE FOR THE LOCATION OF UNDERGROUND UTILITIES OR STRUCTURES, WHETHER OR NOT SHOWN ON THESE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND IDENTIFYING UNDERGROUND UTILITIES AND STRUCTURES.

3. PHOTO DOCUMENT THE EXISTING CONDITIONS OF THE SITE INCLUDING THE CONTRACTOR'S YARD AREA; AREAS WHERE TRENCHING WILL BE OCCURING AND WHERE VEHICLE TRAFFIC IS ANTICIPATED. TEST IRRIGATION SYSTEM FOR PROPER OPERATION. AT PROJECT COMPLETION THE AREAS ARE TO BE RESTORED TO THEIR ORIGINAL CONDITION INCLUDING, BUT NOT LIMITED TO, INSTALLING SOD AT DAMAGED TURF AREAS, REPLACING DAMAGED PLANTING, REPAIRING DAMAGED UNDERGROUND UTILITIES, PATCHING DAMAGED ASPHALT PAVING, RESTRIPING PAVING AND REPLACEMENT OF DAMAGED CONCRETE.

4. HAVE EMERGENCY SHUT-OFF PROCEDURES IN PLACE PRIOR TO START OF CONSTRUCTION. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH SHUT-OFF VALVE LOCATIONS ON SITE AND HAVE PROPER TOOLS AVAILABLE TO OPERATE VALVES.

5. BUILDINGS UNDERGOING ALTERATION OR DEMOLITION SHALL BE IN ACCORDANCE WITH CFC CHAPTER 33 AND CBC CHAPTER 33. MAINTAIN EXISTING FIRE ALARM SYSTEM UNTIL THE NEW SYSTEM OR SYSTEM MODIFICATIONS ARE FUNCTIONAL.

6. WHERE ITEMS ARE CUT DEMOLISHED OR REMOVED, PATCH SURFACES AFFECTED TO MATCH ADJACENT SURFACES. MATCH MATERIAL, TEXTURE, AND PATTERN. REMOVE FASTENERS AND ANCHORS AND PATCH HOLES.

7. WHERE ITEMS ARE CUT, REMOVED OR DEMOLISHED AND PAINTING OR FINISHING IS REQUIRED TO MATCH ADJACENT SURFACES, PAINT OR FINISH THE ENTIRE PLANE OF THE REPAIR.

8. THESE DRAWINGS DO NOT SHOW MATERIALS TO BE REMOVED AND REINSTALLED IN ORDER TO INSTALL NEW WORK. THE EXTENTOF REMOVAL AND REINSTALLATION IS TO BE DETERMINED BY THE CONTRACTOR AND IS NOT CONSIDERED DEMOLITION. REINSTALL MATERIALS PER THE DEMOLISHED ITEMS' NOTES ABOVE.

9. REMOVE, DEMOLISH OR DISPOSE MEANS REMOVE FROM THE SITE AND DISPOSE IN A LEGAL FASHION.

MODERNIZATION NOTES

ARCHITECTPERKINS EASTMAN3194-D AIRPORT LOOP DRIVECOSTA MESA, CA 92626TEL: (714) 427-0277

SHEET INDEX - 44 SHEETS PROJECT DATA VICINITY MAP

LOCATION MAP

N

N

OWNER

SCOPE OF WORKTHE PROJECT INCLUDES THE REPLACING OF FENCING AND GATES AT THE POINT OF ENTRY TO THE SITES OF THE DISTRICT OFFICE AND THE OPERATION CENTER. GENERAL SITE IMPROVEMENTS WILL INCLUDE PARKING RESTRIPING, BUS HOIST, AND NEW ACCESS CONTROL, DOOR HARDWARE, AND CAMERAS INSTALLED. THE PROJECT WILL ALSO INCLUDE REPLACEMENTS OF THE SEWER MAIN.

BID ALTERNATE 1: DISTRICT OFFICE SITE IMPROVEMENTS INCLUDING ASPHALT PAVING, SPEED BUMP, WHEEL STOP REINSTALLATION, AND PARKING RESTRIPING.

BID ALTERNATE 2: OPERATION CENTER SITE IMPROVEMENTS INCLUDING ASPHALT PAVING, NEW CHAIN LINK FENCE, AND CONCRETE CURB.

KC

LICENSEDARCHITECT

STATEOFCALIFORNIA

MARYE.O

NI

DO

UGHERTY

RE

N.OCT.31,2

021

NO.

C-9825

LE

DEFGHJKLM C B A

10

9

8

7

6

5

4

3

2

1

COPYRIGHT © 2018 PERKINS EASTMAN ARCHITECTS, DPC.

3194 D Airport Loop Drive

Costa Mesa, CA 92626

T. +1 714 427 0277

www.perkinseastman.com

JOB

SCALE

PM

DATE

AS NOTED

G001

75182.00

04/16/2021

DIS

TR

ICT O

FF

ICE

AN

D O

PE

RA

TIO

N C

EN

TE

R S

PO

E

10

01

S E

ast

St

& 1

41

1 S

An

ah

eim

Blv

d.

An

ah

eim

, C

A 9

28

05

CO

VE

R S

HE

ET

AN

AH

EIM

ELE

ME

NTA

RY

UN

IFIE

D S

CH

OO

L D

ISTR

ICT

DISTRICT OFFICE AND OPERATION CENTER SPOE1001 S East St & 1411 S Anaheim Blvd. Anaheim, CA 92805

CONSTRUCTION DOCUMENTS

ANAHEIM ELEMENTARY UNIFIED SCHOOL DISTRICT

04/16/2021

SYMBOLS

COFFEE

100

A601

A5

A6

A7

A8

A15

A511

A100

Elevation #Sheet #

Room Name

Sheet #Detail #

Door #

Room #

INTERIOR ELEVATIONS

ROOM NAME AND NUMBERS

DETAIL NUMBER

DOOR NUMBER

DOOR LANDING CLEARANCE

18" @ INT.24" @ EXT.

12" IF DOOR ISEQUIPPED W/A LATCH CLOSER

60"

MIN

. C

LR

.48"

MIN

. C

LR

.

ARCHITECTURE

GENERAL

AD001 DISTRICT OFFICE - DEMOLITION PLANAD002 OPERATION CENTER - DEMOLITION PLANA001 DISTRICT OFFICE SITE PLANA002 OPERATION CENTER SITE PLANA003 ENLARGED SITE PLANSA004 DOOR AND GATE SCHEDULEA005 BUS HOIST DETAILSA006 ORNAMENTAL METAL FENCE AND GATE

DETAILSA007 CHAIN-LINK FENCE AND GATE DETAILSA008 SLIDING GATE DETAILSA009 SITE DETAILS - PARKINGA101 DISTRICT OFFICE - BUILDING A AND C

FLOOR PLANSA102 DISTRICT OFFICE - BUILDING B FLOOR PLANA103 OPERATION CENTER FLOOR PLAN

G001 COVER SHEETTS001 DISTRICT OFFICE - TOPOGRAPHIC SURVEYTS002 DISTRICT OFFICE - TOPOGRAPHIC SURVEYTS003 OPERATION CENTER - TOPOGRAPHIC SURVEY

ELECTRICALDESIGN WEST ENGINEERING412 E VANDERBILT WAY, SAN BERNARDINO, CA 92408TEL: (909) 890-3700

ANAHEIM ELEMENTARY SCHOOL DISTRICT1001 S EAST STREET, ANAHEIM CA 92805TEL: (714) 517-7500

ELECTRICALE001 ELECTRICAL LEGENDS & NOTESE002 SINGLE LINE DIAGRAME003 PANEL SCHEDULESE100 ELECTRICAL SITE PLAN - DISTRICT OFFICEE101 POWER & SIGNAL FLOOR PLAN - BLDG AE102 POWER & SIGNAL FLOOR PLAN - BLDG BE103 POWER & SIGNAL FLOOR PLAN - BLDG CE200 ELECTRICAL SITE PLAN - OPERATION

CENTERE201 POWER & SIGNAL FLOOR PLAN -

OPERATION CENTERE202 POWER & SIGNAL FLOOR PLAN - M&H SHEDE400 ELECTRICAL DETAILSE401 ELECTRICAL DETAILS

LANDSCAPENUVIS3151-D AIRWAY AVECOSTA MESA, CA 92626TEL: (714) 754-7311

CIVILBRANDOW AND JOHNSTON3300 IRVINE AVENUE, SUITE 245NEWPORT BEACH, CA 92660TEL: (562) 728-3302

LANDSCAPEL001 IRRIGATION PLAN & NOTES

DISTRICT OPERATIONS CENTERL002 IRRIGATION LEGEND & NOTES

DISTRICT OPERATIONS CENTERL003 IRRIGATION DETAILS

DISTRICT OPERATIONS CENTERL004 IRRIGATION DETAILS

DISTRICT OPERATIONS CENTERL005 LANDSCAPE PLANTING PLAN, NOTES

& PLANTING DETAILS DISTRICT OPERATIONS CENTER

CIVIL

C101 TITLE SHEET AND GENERAL NOTESC201 TYPICAL DETAILSC301 UNDERGROUND DEMOLITION PLAN

DISTRICT OFFICEC302 DEMOLITION PLAN

OPERATIONS CENTERC401 GRADING PLAN

DISTRICT OFFICEC402 GRADING PLAN

OPERATIONS CENTERC501 UTILITY PLAN

DISTRICT OFFICEC601 EROSION CONTROL PLAN

DISTRICT OFFICEC602 EROSION CONTROL PLAN

OPERATIONS CENTER

DIRECTORY

07/30/2021

KC

LICENSEDARCHITECT

STATEOFCALIFORNIA

MARYE.O

NI

DO

UGHERTY

RE

N.OCT.31,2

021

NO.

C-9825

LE

DEFGHJKLM C B A

10

9

8

7

6

5

4

3

2

1

COPYRIGHT © 2018 PERKINS EASTMAN ARCHITECTS, DPC.

3194 D Airport Loop Drive

Costa Mesa, CA 92626

T. +1 714 427 0277

www.perkinseastman.com

JOB

SCALE

PM

DATE

AS NOTED

TS001

O-0075182.00

12/18/2020

DIS

TR

ICT O

FF

ICE

AN

D O

PE

RA

TIO

N C

EN

TE

R S

PO

E

10

01

S E

ast

St

& 1

41

1 S

An

ah

eim

Blv

d. A

na

he

im, C

A 9

28

05

DIS

TR

ICT O

FF

ICE

-

TO

PO

GR

AP

HIC

SU

RV

EY

AN

AH

EIM

ELE

ME

NTA

RY

UN

IFIE

D S

CH

OO

L D

ISTR

ICT

KC

LICENSEDARCHITECT

STATEOFCALIFORNIA

MARYE.O

NI

DO

UGHERTY

RE

N.OCT.31,2

021

NO.

C-9825

LE

DEFGHJKLM C B A

10

9

8

7

6

5

4

3

2

1

COPYRIGHT © 2018 PERKINS EASTMAN ARCHITECTS, DPC.

3194 D Airport Loop Drive

Costa Mesa, CA 92626

T. +1 714 427 0277

www.perkinseastman.com

JOB

SCALE

PM

DATE

AS NOTED

TS002

O-0075182.00

12/18/2020

DIS

TR

ICT O

FF

ICE

AN

D O

PE

RA

TIO

N C

EN

TE

R S

PO

E

10

01

S E

ast

St

& 1

41

1 S

An

ah

eim

Blv

d. A

na

he

im, C

A 9

28

05

DIS

TR

ICT O

FF

ICE

-

TO

PO

GR

AP

HIC

SU

RV

EY

AN

AH

EIM

ELE

ME

NTA

RY

UN

IFIE

D S

CH

OO

L D

ISTR

ICT

KC

LICENSEDARCHITECT

STATEOFCALIFORNIA

MARYE.O

NI

DO

UGHERTY

RE

N.OCT.31,2

021

NO.

C-9825

LE

DEFGHJKLM C B A

10

9

8

7

6

5

4

3

2

1

COPYRIGHT © 2018 PERKINS EASTMAN ARCHITECTS, DPC.

3194 D Airport Loop Drive

Costa Mesa, CA 92626

T. +1 714 427 0277

www.perkinseastman.com

JOB

SCALE

PM

DATE

AS NOTED

TS003

O-0075182.00

12/18/2020

DIS

TR

ICT O

FF

ICE

AN

D O

PE

RA

TIO

N C

EN

TE

R S

PO

E

10

01

S E

ast

St

& 1

41

1 S

An

ah

eim

Blv

d. A

na

he

im, C

A 9

28

05

OP

ER

ATIO

NS

CE

NTE

R -

TO

PO

GR

AP

HIC

SU

RV

EY

AN

AH

EIM

ELE

ME

NTA

RY

UN

IFIE

D S

CH

OO

L D

ISTR

ICT