Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30

Post on 25-May-2015

233 views 7 download

Tags:

description

Photos of this SlideShare are of the 1st Floor Renovation Project my firm designed for TechTown –Detroit. TechTown is a small business incubator and resource hub for start up, small and medium size businesses. TechTown will unveil this premier Co-Working Office Space in the fall of 2013. The photos posted are tracking the construction progress. Come back next month and see how far along we are. Thanks for viewing.

Transcript of Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30

Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Future Location of Reception/Security DeskTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Electrical Conduit Trenches Filled With ConcreteTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Mechanical Duct Work Installation - 1TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Mechanical Duct Work Installation - 2TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Future Business Incubator Accelerator SuiteTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Metal Studs for Walls Going Up - 1TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Metal Studs for Walls Going Up - 2TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Wall at Business Incubator Accelerator SuiteTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Walls at Event Spaces 1 & 2TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Walls at Conference Rooms 1 & 2TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Walls at Phone BoothsTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Framing Around ColumnTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Framing for Future Mail Box AreaTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Gyp. Board Installation Starts at Future Electrical ClosetTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Gyp. Board Installation Starts at TechTown Management SuiteTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Gyp. Board Installation Starts at TechTown Phone BoothsTechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Gyp. Board Installation Starts Along Corridor 2TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Gyp. Board Installation Starts at Conference Rooms 1 & 2TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Gyp. Board Installation Starts at Conference 1TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Stud Wall With Sound Insulation TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Business Incubator Accelerator Suite Progress TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Mail Box Area Progress TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Corridor 2 Progress TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

More Construction Progress Photos Will Be Posted Next Month TechTown 1st Floor Renovation

June 1 - June 30 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com