Preparing the Proposal

Designing and Supporting Computer Networks – Chapter 9

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 2

Objectives Prepare the proposal using the information developed

so far

Plan for the Internetwork implementation, including timelines, downtime requirements and installation requirements

Identify software and hardware support contract options

Present the network proposal, including implementation schedule and cost summary

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 3

Begin Preparing the Proposal using the Information Developed so Far

Organize the existing information

Determine the format requested in the RFP

If no format is specified, prepare a layout and design for the proposal

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 4

Begin Preparing the Proposal using the Information Developed so Far

Integrate the existing information:

Executive summary

Network requirements and current network environment

Physical and logical design

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 5

Plan for the Internetwork Implementation

Create an Implementation plan

Create a cost proposal

Include customer expectations and success criteria

Obtain customer approval before beginning implementation

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 6

Plan for the Internetwork Implementation

Determine the best installation method:

New installation

Phased installation

Complete replacement

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 7

Plan for the Internetwork Implementation

Estimate timelines and resources

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 8

Plan for the Internetwork Implementation

Create an installation schedule based on maintenance windows and downtime allowances

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 9

Plan for the Installation

Prepare the cost estimate by creating a Bill of Material:

Order new and replacement parts

Identify additional devices

Identify upgrades to existing devices

Identify software requirements

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 10

Plan for the Installation

Describe the services and support provided by the SMARTnet agreement:

Software support

Cisco TAC

Registered access to Cisco.com

Advanced replacement of hardware parts.

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 11

Plan for the Installation

Describe the main benefits/entitlements of Cisco technical services and support

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 12

Plan for the Installation

Identify the benefits of Cisco software support

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 13

Present the Network Proposal to the Customer

Complete the proposal and develop a proposal presentation

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 14

Present the Network Proposal to the Customer

Present the network design proposal to the class and gain sign-off from the instructor:

Include slides or other visual aids

Incorporate presentation best practices

© 2006 Cisco Systems, Inc. All rights reserved. Cisco Public 15

Summary Implementing a network design includes installing

hardware, configuring systems, testing the network, and launching the network into production.

Maintenance windows and planned downtime need to be included in the installation timeline.

The SMARTnet program offers the customer service enhancements and maintenance support resources.

Proper preparation before the presentation can mean the difference between customer sign-off and losing the project.