Post on 19-Jan-2016
Capstone Design - Production planning
• 20082419 박차영• 20082420 김동연• 20082432 설인수
Division of roles
In su
Cha young
Sketch
Dong yeon
PPT produced
Common
Production planning
Sketch and Data Collection
Contents- Schedule (Gantt chart)- Items problems- The proposed design item- Expected Effects- user demands- Idea sketch- Constraints- schematically approach
Schedule plan3 4 5 6
1 2 3 4 1 2 3 4 1 2 3 4 1 2
Team organization
Subject selection
Ideas plans
After research idea of re-establishing
Production planning and materials buy-ing
materials buying, Prototyping
After producing modification
Final production
Items problems
The proposed design item
Expected Effects
- When drying laundry can be dried quickly.
Can dry laundry on a rainy day.
user demands
WhyWhen/Where
HowWho Discon-
tentuse Use process
Comple-mentary Products
Incoming rain wash well to dry.
home
Clothes dryer is used by placing the heating ele-ment.
-Rain and dry wash.
userI can be some-what cumber-some.
materials
Idea sketch
Idea sketch
Idea sketch
Idea Adopted
• Prototype development costs ₩ 40,000
• Prototype development time - 10 weeks
Constraints
Thank you