Post on 10-Jun-2020
HURSTBRIDGE LINE
Buses will replace trains between Clifton Hill and MacleodUntil last service Sunday 6 May 2018
Planned disruptions to train services Normal train services will resume and Rosanna Station will open on Monday 7 May 2018
Authorised and published by the Victorian Government, 1 Treasury Place, Melbourne
Follow us on social media @levelcrossings
Contact usPLANNING YOUR JOURNEY
We’re here to help you travel during major construction and get you to and from your destination as quickly and easily as possible. We’ll continue to keep you updated on works and advise you of the best way to travel.
To plan your journey visit ptv.vic.gov.au or call 1800 800 007.
You can also download the PTV app for journey planning or metroNotify for live updates pushed to your device directly from Metro’s control room.
Do you know of a neighbour or nearby resident who has special needs when taking public transport?
They may be vision or hearing impaired and need this information in another format, or have a mobility aid and require additional assistance. Please contact PTV and we will be able to assist you.
FOR INFORMATION ON THE PROJECT
Please contact the Level Crossing Removal Authority on: Email: contact@levelcrossings.vic.gov.au Call: 1800 105 105Web: levelcrossings.vic.gov.au
Bikes, pets and surfboardsUnfortunately, bicycles, dogs and surfboards aren’t allowed on replacement buses.
In accordance with the Victorian Fares & Ticketing Manual 2018, bicycles (except folding bicycles), surfboards, dogs and other pets are not permitted to travel on buses. An exception exists for guide dogs, hearing guide dogs, guide dogs in training, animals identified by an Assistance Animal Pass and small animals if they are suitably contained.
TicketsRemember to touch on and off at the beginning and end of your journey. When catching a replacement bus, you can touch on and off at your connecting train station.
CHANGES TO YOUR SUNBURY LINE SERVICE
Translation service – For information in other languages, please call 9280 0780.
Please contact us via these details to register for SMS or email updates.
Follow us on social media @levelcrossings
From Monday 30 April to last service Sunday 6 May 2018Buses will replace trains between Clifton Hill and Macleod.A range of different bus services will be operating, including express, limited express and stopping all stations services to help make your journey as direct as possible.
Information will be displayed at your station, at train replacement bus stops and will be available online.
To get the latest travel information on when trains will be running on the Hurstbridge Line, call 1800 800 007 or visit ptv.vic.gov.au.
CHANGES TO YOUR HURSTBRIDGE LINE SERVICEWe have been busy working around the clock in March and April to remove two dangerous and congested level crossings, build a brand new Rosanna Station, and duplicate the single section of track between Heidelberg and Rosanna.
Whilst the majority of works are completed, the rail signalling system that allows trains to travel safely on the network has taken longer than anticipated due to the condition and age of the infrastructure.
To ensure a safe return to train services on the Hurstbridge line, the disruption has been extended and trains will now resume on Monday 7 May 2018.
TRAIN TRAIN
Clifton Hill WestgarthCITY Watsonia HURSTBRIDGEVictoria Park Dennis Fairfield Alphington Darebin Ivanhoe Eaglemont Heidelberg Rosanna Macleod
Train replacement bus service
Travel on the Hurstbridge Line
Stopping all stations Stopping all stations from Clifton Hill to Macleod.
Limited express
Limited express from Clifton Hill to Ivanhoe, then stopping all stations from Heidelberg to Macleod. Please note, limited express services will only stop at Ivanhoe on regular weekdays.
Express
Express between Victoria Park and Macleod. Please note, express services will only operate on weekdays before 9pm.
Allow an extra 55 mins
From Monday 30 April to last service Sunday 6 May 2018Buses will replace trains between Clifton Hill and Macleod
Trains on the Hurstbridge Line will run to a revised timetable during the disruption.
Please note, a revised timetable will also operate on the South Morang Line.
Train services will resume on Monday 7 May 2018.