BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE

Post on 13-Apr-2022

6 views 0 download

Transcript of BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE

BASSICK HIGH SCHOOLBRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATEOctober 11, 2018

Project Schedule:

• Programming/Feasibility Studies

• Design

• Construction

• Occupation

BASSICK HIGH SCHOOL

Programming/Feasibility study will investigate

three options for Bassick:

• Renovate existing building as-new

• Demolish old buildings, build new high

school

• Hybrid option

BASSICK HIGH SCHOOL

BUILDING PLANS – EXISTING SCHOOL

1st floor Plan

EXISTING SF• 1,050 Students—Grades 9-12

• 250,456 SF Existing

1st floor Plan

EXISTING SF

1st floor Plan

• 1,050 Students—Grades 9-12

• 250,456 SF Existing

- 220,959 SF*= 29,497 SF Over State

maximum square footage

* Office of School Construction Grants sets maximum eligible square footage based on enrollment

PROGRAMMINGGoal: To develop a comprehensive Bassick High School Program serving future generations of students and faculty, and community

• 6 programming meetings/presentations• 3 days of Departmental interviews• Existing Building investigations and 3D modelling• Development of comprehensive space program

A Space Program captures the space requirements for all areas in the school, and addresses their organization and relationships.

PROGRAMMINGGoal: To develop a comprehensive Bassick High School Program serving future generations of students and faculty, and community

• 6 programming meetings/presentations• 3 days of Departmental interviews• Existing Building investigations and 3D modelling• Development of comprehensive space program

A Space Program captures the space requirements for all areas in the school, and addresses their organization and relationships.

PROGAM ORGANIZATIONBassick program organization• Houses

• Freshman Academy• Advanced Manufacturing,

Automotive, Building technologies• Liberal Art/Humanities

• Distributed Administration• 3 Assistant Principal’s offices• Guidance, Student Support and

other administrative areas bundled with AP offices

SELECTED PROGRAM AREAS

Program Areas• Core Academic Spaces• Administration• Freshman Academy• Advanced Manufacturing and

Automotive• Construction Technology• Culinary• Medical Health Careers• Art/Graphics• Performing Arts

• Observatory/Planetarium• Special Education• Health/Physical Education• Media Center• Food Service• Nursing• Community Health Clinic• Custodial/Maintenance and

Infrastructure

Core Academic

CORE ACADEMIC

Advanced Manufacturing and Automotive

ADVANCED MANUFACTURING AND AUTOMOTIVE

Culinary and Medical HealthAcademy

CULINARY AND MEDICAL HEALTH

Performing Arts and Vocations and Technology

PERFORMING ARTS AND VOCATIONS AND TECHNOLOGY

Observatory/Planetarium

OBSERVATORY/PLANETARIUM

Health and Physical Education

HEALTH AND PHYSICAL EDUCATION

Dining and Food

DINING AND FOOD

Administration

ADMINISTRATION

Custodial and Maintenance

CUSTODIAL AND MAINTENANCE

SPACE PROGRAM TOTALS• 1,050 Students—Grades 9-12

• 220,489 SF Existing

- 220,959 SF*= 470 SF Under State

Maximum square footage

* Office of School Construction Grants sets maximum eligible square footage based on enrollment

NEXT STEPS

• Develop three conceptual options

• Prepare schedules for each

• Develop project budgets

• Estimate state grant funding

• Select preferred option

• Submit updated SCG-049 to SCG&R by November 15, 2018

Questions and Answers

BASSICK HIGH SCHOOLOctober 11, 2018