BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE
Transcript of BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE
BASSICK HIGH SCHOOLBRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATEOctober 11, 2018
Project Schedule:
• Programming/Feasibility Studies
• Design
• Construction
• Occupation
BASSICK HIGH SCHOOL
Programming/Feasibility study will investigate
three options for Bassick:
• Renovate existing building as-new
• Demolish old buildings, build new high
school
• Hybrid option
BASSICK HIGH SCHOOL
BUILDING PLANS – EXISTING SCHOOL
1st floor Plan
EXISTING SF• 1,050 Students—Grades 9-12
• 250,456 SF Existing
1st floor Plan
EXISTING SF
1st floor Plan
• 1,050 Students—Grades 9-12
• 250,456 SF Existing
- 220,959 SF*= 29,497 SF Over State
maximum square footage
* Office of School Construction Grants sets maximum eligible square footage based on enrollment
PROGRAMMINGGoal: To develop a comprehensive Bassick High School Program serving future generations of students and faculty, and community
• 6 programming meetings/presentations• 3 days of Departmental interviews• Existing Building investigations and 3D modelling• Development of comprehensive space program
A Space Program captures the space requirements for all areas in the school, and addresses their organization and relationships.
PROGRAMMINGGoal: To develop a comprehensive Bassick High School Program serving future generations of students and faculty, and community
• 6 programming meetings/presentations• 3 days of Departmental interviews• Existing Building investigations and 3D modelling• Development of comprehensive space program
A Space Program captures the space requirements for all areas in the school, and addresses their organization and relationships.
PROGAM ORGANIZATIONBassick program organization• Houses
• Freshman Academy• Advanced Manufacturing,
Automotive, Building technologies• Liberal Art/Humanities
• Distributed Administration• 3 Assistant Principal’s offices• Guidance, Student Support and
other administrative areas bundled with AP offices
SELECTED PROGRAM AREAS
Program Areas• Core Academic Spaces• Administration• Freshman Academy• Advanced Manufacturing and
Automotive• Construction Technology• Culinary• Medical Health Careers• Art/Graphics• Performing Arts
• Observatory/Planetarium• Special Education• Health/Physical Education• Media Center• Food Service• Nursing• Community Health Clinic• Custodial/Maintenance and
Infrastructure
Core Academic
CORE ACADEMIC
Advanced Manufacturing and Automotive
ADVANCED MANUFACTURING AND AUTOMOTIVE
Culinary and Medical HealthAcademy
CULINARY AND MEDICAL HEALTH
Performing Arts and Vocations and Technology
PERFORMING ARTS AND VOCATIONS AND TECHNOLOGY
Observatory/Planetarium
OBSERVATORY/PLANETARIUM
Health and Physical Education
HEALTH AND PHYSICAL EDUCATION
Dining and Food
DINING AND FOOD
Administration
ADMINISTRATION
Custodial and Maintenance
CUSTODIAL AND MAINTENANCE
SPACE PROGRAM TOTALS• 1,050 Students—Grades 9-12
• 220,489 SF Existing
- 220,959 SF*= 470 SF Under State
Maximum square footage
* Office of School Construction Grants sets maximum eligible square footage based on enrollment
NEXT STEPS
• Develop three conceptual options
• Prepare schedules for each
• Develop project budgets
• Estimate state grant funding
• Select preferred option
• Submit updated SCG-049 to SCG&R by November 15, 2018
Questions and Answers
BASSICK HIGH SCHOOLOctober 11, 2018