Post on 01-Feb-2021
Awalé Resources - Bondoukou Project: The Awari Shear Delivers Multiple New Gold in Auger Anomalies
Figure 1: Awalé’s Gold Project Locations
Figure 2: Bondoukou Project – All auger drilling over Awari Shear showing previously reported (2017) results and the current reporting area.
Figure 3: Awari NW auger drill results – 3 Priority (orange) (12km strike) and 2 (yellow) secondary targets for infill drilling.