RFA log Sheet

LOG SHEET OF REQUEST FOR INFORMATION ProjectWEST SUPER BLOCKArchitecturalLocation3rd cor 5th and 28th Avenue, West Crescent District, Fort Bonifacio Global, Taguig City Date Released TITLEReply NeededRESPONSEACTIONS TO BE TAKENnot activePlease clarify the division 7 thermal moisture protection, traffic coating part 2 clause 2.01 - A ELASTOMERIC URETHANE TRAFFIC TOPPING Provide at parking slots/driveways directly above water tanks at Basement 2. In relative to the water tanks location at B6. which will govern B6 or B2?Please clarify the division 7 thermal moisture protection, traffic coating part 2 clause 2.01 - C ELASTOMERIC URETHANE TRAFFIC TOPPING Dry Mil Thickness: Ramps and turn-around areas: Provide minimum 30mils additional wearing coat with aggregate over medium duty coating (for heavy duty usage). Kindly clarify the as per schedule of finishes is 200mm x 200mm Non-skid Concrete Pavers and the water proofing as per cold fluid waterproofing is included the ramp Vehicular Ramps from Basement 1 to Basement 2. Clarify which material to be used?

LOG SHEET OF REQUEST FOR APPROVAL ProjectWEST SUPER BLOCKArchitecturalLocation3rd cor 5th and 28th Avenue, West Crescent District, Fort Bonifacio Global, Taguig City Date Released TITLEReply NeededRESPONSEACTIONS TO BE TAKEN

LOG SHEET OF REQUEST FOR APPROVAL ProjectWEST SUPER BLOCKArchitecturalLocation3rd cor 5th and 28th Avenue, West Crescent District, Fort Bonifacio Global, Taguig City Date Released TITLEReply NeededRESPONSEACTIONS TO BE TAKEN

PREPARED BY JCE