Successfully Leading Change During an SAP Upgrade Session 2707.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration
View From CERN
View From CERN Summary of Upgrade Projects: Phase 1 IR upgrade: construction project LINAC4: construction project Phase 2 collimation: design finalization.