Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Fast Beam Losses during Beam Dump Process due to ( missing ) LR Beam-Beam kick
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Sat/Sun 26/27 th March
What are the issues with injecting unsafe beam into the LHC ?
Production of bunch doublets for scrubbing of the LHC
2012 SPS Scrubbing Run