Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
Superconducting solenoid for MPD detector on heavy-ion collider NICA at JINR (Dubna) Presented by Evgeny K. Koshurnikov CERN September 27, 2011.
Operator vs. Automation Navid Radnia Lawrence Berkeley National Lab 88” Cyclotron Operations August 7, 2012.
NCSX Status and Budget Requirements Hutch Neilson, for the NCSX Team
DIII-D San Diego, CA (1986) NSTX-U Princeton, NJ USA (1999) W7-X Greifswald, Germany (2015) ASDEX-U Garching, Germany (1991) JET Abingdon, UK (1983) MAST.
FIELD PERIOD ASSY Aug 25, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r4
FIELD PERIOD ASSY Aug 13, 2003 M. Cole and FPA Team 20030811-Field-Period_Assy-r2
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
HXRSS Design Status
Part II
Superconducting solenoid for MPD detector on heavy-ion collider NICA at JINR ( Dubna )