Overview IDC – Interchange Distribution Calculator Market Flow Calculator Revenue Uplift / Schedule Infeasibility CAT – Curtailment Adjustment.
1 Compliance Report WECC Annual Meeting April 20, 2006 Steve Rueckert Director, Standards and Compliance.
Report of the Operating Committee Don Watkins Operating Committee Chair April 28, 2009.
Copyright © 1997-2012 V&R Energy Systems Research, Inc. All rights reserved. 1 Use of Node-Breaker Model in POM Suite/ROSE Software Presented by Marianna.
1 Compliance Report WECC Board of Directors Meeting December 7-8, 2006 Steve Rueckert Director, Standards and Compliance.
1 TEPPC March 25, 2010. 2 CCPG Transmission Providers.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Interoperability Case Study: Recipe for Success Washington DC | June 24, 2010 | Tony Giroti 1 Copyright © 2010 Bridge Energy Group, Inc., All Rights Reserved.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team WECC Regional Criterion PRC-006-WECC-CRT-1 (Project WECC-0065) Underfrequency Load Shedding.
PER-002-0 or NERC wants you to have one of them there System Operator training programs. SPP Compliance Workshop Tulsa Oklahoma, Oct 31, 2006 Ron Maki.
iPDC Report Nitesh