10.pdf
© 2007 Sprint Nextel. All rights reserved. 1 Teleworking and Remote Operations Michigan Digital Government Summit October 10, 2008 Dan Seeley – Solutions.
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Tunnel Technical Report
Very Pleasant/Painful Networking: The Highs and Lows of Building and Maintaining IPsec Based Customer Access VPNs Matthew W. Baker Intel Online Services,
J.C. Sheppard, SLAC Americas Region September 27, 2006 1 ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
Nick Walker (DESY/GDE) GDE Internal Cost Review FNAL 13.11.12 ILC Design Overview 13.12.12 N. Walker ILC PAC TDR review1.
The Italian Highway System: A Public/Private Partnership.
Tutorial 06 Intersecting Tunnels
Global Design Effort Dubna, 5 June 2008 Part I of Summary for WG C/D Conveners: Ewan Paterson (SLAC), Nikolay Solyak (FNAL), Andrei Seryi (SLAC), Masao.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
Tor Raubenheimer CLIC and Other Options for Multi-TeV Lepton Physics Tor Raubenheimer Accelerator Research Division Head, SLAC P5 Meeting Fermilab February.