GSM Cell Planning and Optimization
Gsmcellplanningandoptimization 12962295044549-phpapp01
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Rf optimisation gsm sudarshan
Openings 26_01_2014
Observations and measurements on the ZS during the SPS MD 27-29 April 2010
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
A.Blas APC meeting 12/5/2005 1 Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
Status of the PS TFB
Beam stability with separated beams at 6.5 TeV
Guidelines for conceptual design Main design features: - TCS vs. TCSP; TCTP vs. TCSP