Holger Schlarb, DESY, 16 th DESY-MAC 10.11.2010 FLASH LLRF & Synchronization System + Roadmap On behalf of the LLRF and Laser based Synchronization team.
FLASH. Free-Electron Laser in Hamburg Lessons from FLASH FLASH Upgrade FLASH II Lessons Siegfried Schreiber DESY FLS 2010 SLAC 1-6 March 2010.
The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Fermilab AAC May 11 th 1/12 Testing of Cap-Cav 2 LLRF Development with DESY Alexander Brandt, DESY, Hamburg 1.Current and Future LLRF Developments at DESY.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
D-RATS
Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS G. Trento Accelerator Systems Division Argonne National.
350MHz RF Waveguide Air Personnel Safety System Dave Bromberek March 3, 2008.
Emergency Communications with D-RATS
Emergency Communications with D-RATS Dan Smith, KK7DS [email protected].
HERA Technical Improvement Program M. Bieler, DESY, 5.11.2005