1Beam Line Review. 17th November 2007. 2 3 4 Detector parameters Fermilab Beam line monitors built to replaced SWICS Scintillating fibre tracker – readout.
Beam Position Monitors MICE CM Harbin January, 2009.
Veto Counter test Hyupwoo Lee 2007/06/18. Setup – cable length test 2 scope setup - recall Cable_Length.SET using floppy disk Section # -> C02, C08, C14.
Digital Hadron Calorimeter Cosmic Ray Test Stand.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting 4.09.07 Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Cosmic Ray Workshop May 15, 2010 1 Cosmic Ray Detector Kit.
C.F. Feb 15 2011