1 NuPECC/Funding Agencies, Paris, 29 November 2004 NuPECC Long Range Plan Overview of the Physics Case Recommendations & Priorities Muhsin N. Harakeh NuPECC.
8 December 2005Edinburgh U seminar – Chris Damerell 1 Vertex Detectors and the Linear Collider Chris Damerell Rutherford Appleton Lab What is their purpose?
Roman Lietava, University of Birmingham UK HEP Forum 1 ALICE Experiment Physics motivation Detectors Observables and Physics Performance Summary Roman.
LHC Upgrade Kai Hock. 1.The LHC 2.Motivation and Activities 3.The Science Case 4.Technical Issues and Challenges 5.Opportunities for us 6.Scale of project.
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Two Higgs are better than one: Physics at the Super Large Hadron Collider and the implications for the CMS Silicon Tracker Tom Whyntie 1 st year PhD student,
Design Study High Luminosity LHC (HL-LHC) Collaborative Project FP7-INFRASTRUCTURE-2010 By Lucio Rossi – CERN 1st Meeting @ CERN 20 July.
Future large scale accelerator projects for particle phys
L1 Track Trigger for ATLAS at HL-LHC Nikos Konstantinidis (University College London) RAL seminar, 18/05/2011.
INTRODUCTION TO e/ ɣ IN ATLAS In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to identify.
SLHC - SLAC, April 24, 2003 1 Super LHC - SLHC LHC Detector Upgrade Dan Green Fermilab.
Klaus Desch, Report from the Higgs Working Group, ECFA/DESY Workshop Amsterdam, 4/4/03 1 Report from the Higgs Working Group Convenors: M.Battaglia K.Desch.