Summary Session 2 Machine Studies 15/2/2012 Ralph Aβmann & Giulia Papotti Thanks to Frank Zimmermann LHC Performance Workshop, Chamonix, 6-10.2.2012 R.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
SPS Scrubbing Runs 2014 week 45 and week 50 (part I) H. Bartosik, G. Iadarola, K. Li, L. Mether, G. Rumolo, M. Schenk Thanks to: SPS OP crew, G. Arduini,
ELECTRA PRE-AMPLIFIER: A REPETITIVELY PULSED, ELECTRON BEAM PUMPED, KrF LASER* * Work sponsored by DOE/NNSA/DP Naval Research Lab Matt Myers John Sethian.
ELECTRA PRE-AMPLIFIER: A REPETITIVELY PULSED, ELECTRON BEAM PUMPED, KrF LASER*
LIU-SPS Open C-core MKE Extraction Review Discussion and concluding remarks
Chapter 7: Current Measurements A: Eulerian techniques/instruments 1. Mechanical current meters “Unidirectional” (Savonius) rotor plus vane problem: Counting.
LHC Lumi Days – 01/03/2012 Jean-Jacques Gras on behalf of the CERN Beam Instrumentation Group 1.
Summary of week 44
Test beams status Protvino source: V. Ammosov Dubna source: P.Rukoyatkin, E.Strokovsky Václav Vrba Institute of Physics, AS CR, Prague – LCTW09, LAL,