Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Calorimeter Status: Preparing RUN II & LS2 Pascal Perret LPC Clermont 24 February 2015.
7/19/20121 PHENIX WEEKLY PLANNING 7/19/2012 Don Lynch.
SESAME A light source for the Middle East Herman Winick SLAC National Accelerator Laboratory [email protected] FLS 2012, JLab March 7, 2012 Mar.
Polarized He-3 Target Progress
CERN, 21-4-2009 Main challenges for the ATLAS upgrade project in the coming year.
Quarkonium Production at DØ
The ATLAS U pgrade Programme
SESAME A light source for the Middle East Herman Winick SLAC National Accelerator Laboratory
Magnet