Status of the EURISOL Design Study and Plans for FP7 Peter Butler University of Liverpool.
Proton Capabilities at Fermilab Steve Holmes Neutrino Summit 21 July 2014.
MegaWatt Proton Beams for Particle Physics at Fermilab
Ted Fox Interim Associate Laboratory Director Energy and Engineering Sciences Oak Ridge, Tennessee March 21, 2006 Oak Ridge National Laboratory.
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay.
Status of the EURISOL Design Study
Advanced accelerator research with focus on plasma wakefield acceleration, University of Oslo, Erik Adli, University of Oslo, August 2014, [email protected],
MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes P5 Meeting/BNL December 16, 2013 projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Project X: 8 GeV Transfer and Injection Injection Painting Kick-off meeting
F Axis NO A Status NO A Collaboration Meeting Fermilab 17 November 2006 Gary Feldman.
EURISOL: European Collaboration towards the ultimate ISOL facility