TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
LHC status and commissioning plans Gianluigi Arduini, CERN, AB/ABP 10 th September 2007 Acknowledgements: R. Bailey, M. Lamont.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
LHC Performance Workshop - Chamonix 2009 3 February 2009 Jim Strait Fermilab Risk Analysis for the Different Consolidation Proposals.
27/9/2011TWEPP 2011 F. Anghinolfi CERN/PH/ESE1 The Electronics System of the ALFA Forward Detector for Luminosity Measurements in ATLAS Presenter : F.
SPSC116 Summary Lau Gatignon, 14 January 2015. Accelerators Ion preparations are well under way, including de-bunching and recapture. Ion interlock against.
LHC Machine Protection
The Electronics System of the ALFA Forward Detector for Luminosity Measurements in ATLAS
Second LHC Splice Review
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
IEFC 2010 Workshop How to keep the PS operational for the next 25 years.
QPS R2E Mitigation and Consolidation Strategies for LS1