DT Hardware Status and Monitoring A.Benvenuti INFN Bologna Muon Barrel Workshop 28/09/2010.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
1/17 Trigger matching of combined muons with reprocessed physics_MinBias DESD_COLLCAND Susumu Oda ICEPP, University of Tokyo 2010/01/14.
Oliver Bitterling Introduction to the QPS Radiation damage in electronic systems Construction of radiation tolerant systems Radiation test and.
Simulation of transition crossing in the Fermilab Booster Xi Yang
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN
Update on HF PMT magnetic shielding
1 Simulation of transition crossing in the Fermilab Booster Xi Yang September 5, 2006 Xi Yang the work has been done in collaboration with Alexandr Drozhdin.
Main magnet apertures (baseline) Vacuum chamber geometry for dipoles optimization parameters
DT Hardware Status and Monitoring