NLC - The Next Linear Collider Project “Slow” Feedback Requirements: Deflections and Luminosity Linda Hendrickson IPBI Meeting, SLAC June 26, 2002.
Beam Commissioning WG, 10 August 2010 1 Luminosity Scans in the LHC S. White.
Evian summary 1 24-1-2011 Operational challenges (Feed forward from Evian LHC operation workshop) 7-9 December 2010 Day after last beam Two nights – 7.
Summary
Operational challenges ( Feed forward from Evian LHC operation workshop)
Fri 6 /4
Overview and alignment results of the BPM button collimator mock-up