LHC Beam Operations Past, Present and Future Maria Kuhn on behalf of the LHC team 03-14-2013 Moriond QCD 2013.
Design and Performance of the Upgraded SPS Damper after LS1 G. Kotzian for the Damper Team BE-RF-FB, 13. February 2015MSWG