Breakdown of tests foreseen in preparation for beam Equipment folder: tests results, handling of NC, performance below specs, machine as commissioned vs.
The Status of the LHC Controls System Shortly Before Injection of Beam
15 Sep 2007 ICALEPCS'07 - P.Charrue - CERN1 The Status of the LHC Controls System Shortly Before Injection of Beam Pierre Charrue on behalf of CERN Accelerator.
The Status of the LHC Controls System Shortly Before Injection of Beam Pierre Charrue on behalf of CERN Accelerator and Beams Controls Group.
LHC Controls Infrastructure and the timing system
Daniela Macina (CERN )
Preparation for Circulating Beam Beam Instrumentation 2008 Extended LTC – J-J GRAS [AB-BI]