KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
New Solution for BAU George W.S. Hou (NTU) 2nd Open sBelle, 7/3/08 1 A New Solution for Baryon Asymmetry of the Universe July 3 2008, 2nd Open meeting.
A 10 minutes mini-review on the flavor problem (mixing, CP- violation) Hisakazu Minakata Based on “minus 10 minutes attack” Fully biased 10 minutes counterattack.
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
1 KEKB Status and Upgrade Plan with Crab Crossing Second Electron-Ion Collider Workshop March 16,2004 Mika Masuzawa, KEK.
The 4th EIC workshop May 19-23, 2008 Experience with Crab cavities The 4th Electron Ion Collider Workshop 19-23 May, 2008 Hampton University Mika Masuzawa,
2003.12.09Beam Induced Pressure Rise in Ring, Dec. 9-12, 20031 Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC meeting@KEK.
ATF2 Kiyoshi KUBO 2013.05.27. Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Status of Nb sample study TILC09 Main Linac S0 session 18 April 2009 T. Saeki on behalf of SRF surface analysis group at KEK.
Magnetic design of a superconducting magnet for the FFAG accelerator T.Obana, T.Ogitsu A,T.Nakamoto A,K.Sasaki A A.Yamamoto A, M.Yoshimoto A, Y.Mori A,T.Origasa.