EU-PWI-Task Force V. Philipps, TF Meeting, 17-19 2005 Cadarache Status of ITER like wall project V. Philipps ITER 2 options are under preparation, decision.
1E. TsitronePWI TF meeting 17-19/10/2005 Euratom Plasma Wall Interactions : Tore Supra recent results E. Tsitrone for Tore Supra team With special thanks.
A Joint Australian Fusion Energy Initiative Strategic plan for Fusion Science – ITER forum – Capability, infrastructure, Flagship Diagnostic? Initial ISL.
Study of negative ion surface production in caesium-free H 2 plasma PhD student: Kostiantyn Achkasov Tutors: Gilles Cartry and Alain Simonin 3 rd FUSENET.
Kaschuck Yu.A., Krasilnikov A.V., Prosvirin D.V., Tsutskikh A.Yu. SRC RF TRINITI, Troitsk, Russia Status of the divertor neutron flux monitor design and.
Status of the divertor neutron flux monitor design and integration