Layout Drawings of the LHC Collider A. Vergara-Fernández S. Chemli B. Maire Y. Muttoni A. Kournossenko R. Zalyalov TS Workshop May 4 th 2004.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
Hardware Commissioning
What ALICE requires and provides for background optimization
Radiation study of the TPC electronics
LHC Experimental Vacuum Upgrades: Status
SECTION BETWEEN INNER TRIPLET AND QRL AT LSS5L
LHC status and commissioning plans
LHC Status Report RRB 27 April 2009 Steve Myers
Matching section layout vs. crab-cavity voltage
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.