July 20121. 2 Founded in 2011 to commercialize a new nanotechnology and superconductor products resulting from a decade of self funded laboratory research.
Installation and Testing Results of Long Island Transmission Level HTS Cable
High- Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano
Cable Options for Eucard 2
WP6 Thermal-Electric Model of Hi- Lumi SC Link
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
1 Flexible Cryostats for Long Superconducting Cables: Requirements, Status and Prospects Michael Gouge, ORNL J. A. Demko, ORNL OLAV III Operation of Large.