F.Garibaldi – TOPEM phone meeting 26-05-2010 Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
F.Garibaldi – TOPEM phone meeting 26-05-2010
ATLAS SCT module performance: beam test results
The CEBAF 200kV Inverted Gun P. Adderley, M. BastaniNejad, J. Clark, J. Grames, J. Hansknecht, J. McCarter, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law.
HF Laser/LED Calibration Studies