6/14/11 Collimation Upgrade Plan & Questions R. Assmann, CERN for the collimation team 14/6/2011 LHC Collimation Project Review.
Long term beam dynamics in an ultra-low energy storage rings (BETACOOL and non-linear studies)
[R. Alemany] [CERN BE/OP] [Engineer In Charge of LHC] Lectures at NIKHEF (21.03.2013 )
The Large Hadron Collider LHC Operation II: pushing the limits UFOs SEUs e-cloud 25 ns operation Beam-beam effects [R. Alemany] [CERN BE/OP] [Engineer.