DOE/HEP SciDAC AST Project: “Advanced Computing for 21 st Century Accelerator Science and Technology” Impact of SciDAC on Accelerator Projects Across SC.
Super B factory plan at KEK Masa Yamauchi KEK Super B Factory Workshop April 20-22, 2005 Honolulu Why, how, what, who, when and how much?
Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, 2005 2 nd Joint Super B factory WS in Hawaii.
US Participation in the International Collaboration at Super KEKB Tom Browder (University of Hawaii) 1. Accelerator: Plan and Track Record 2. Detector.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
75 Years of Particle Accelerators Andrew M. Sessler Lawrence Berkeley National Laboratory Berkeley, CA 94720 Accelerators started with some theoretical.
ERL RF Systems
ESS Design Options David McGinnis 4 March 2013 1.
Vacuum Electron Device Limitations for High-Power RF Sources
K.Furukawa, KEK, RF-gun review, Feb.2015. Linac Upgrade towards SuperKEKB Injector Linac Kazuro Furukawa for Injector Linac 1.
Vacuum Electron Device Limitations for High-Power RF Sources Heinz Bohlen, Thomas Grant Microwave Power Products Division CPI, Palo Alto 1.
M. Wakasugi, et al., Nucl. Instr. and Meth. A 532 (2004) 216-233 Total length 650mm Trapping region 〜 260mm 42 thin electrodes are stacked every.