WP 4 MR design, building and testing. Leader: Julien Muller, RS2D 11/12/2014 Deliverable Report: D4.1 MR System specification.
1 Air Monitoring: Back to Basics. 2 Air monitoring is commonly performed on Hazardous Waste Operations (HazWoper) sites There is more to air monitoring.