Building the perfect schedule (v5)(notes)
Survey
Game Scheduling Orientation. Timeline Why wait until December 13 to begin? Need to schedule conference games first, conferences might change up through.
March 2010 Telephone Survey EMC Research, Inc. 811 First Avenue – Suite 451 Seattle, WA 98104 (206) 652-2454.
Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.
00238604
MAC Protocols for Ad Hoc Wireless Networks