AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Steam Turbine Prime Movers
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
0 Generator Cost Curves Generator costs are typically represented by up to four different curves – input/output (I/O) curve – fuel-cost curve – heat-rate.
Lecture 17 Economic Dispatch, OPF, Markets Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
EE 369 POWER SYSTEM ANALYSIS Lecture 16 Economic Dispatch Tom Overbye and Ross Baldick 1.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
Acadiana Load Pocket Project
GRID OPERATION AND UTILITY OF MODERN LOAD DISPATCH AND COMMUNICATION SYSTEMS
STORAGE OVERVIEW 2010 Steve Isser, JD, PhD Vice President & General Counsel Good Company Associates.