Department of Environmental Protection CLEAN FILL POLICY Cleanup Standards Scientific Advisory Board May 6, 2004.
Texas Pollutant Discharge Elimination System Stormwater Construction General Permit (CGP) 2015 TCEQ Environmental Trade Fair May 6, 2015 Dan Siebeneicher.
1. What is an NPDES Permit? An NPDES permit is an authorization to discharge (compliance with the Clean Water Act) There is no right to a permit and it.
MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.
Water Quality Division Updates David W. Galindo, Director.
CT DOT 2014 Qualified Inspector Training General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities.
Storm Water Permits The Problem of Phasing In –Potentially have every industrial facility in the U.S. needing a permit at the same time at the same time.