1 ECS CALO HV Control CALO Piquet Training Session 26.06.08 Anatoli Konoplyannikov /ITEP/ Outline ECS HV control of the ECAL and HCAL. ECS HV control.
Page 1 2011 Jan 11 – AAS Splinter Session - Getting Started with Kepler Getting Started with Kepler Kepler Science & Guest Observer Offices Steve Bryson.
Christian Müntz (Univ. Frankfurt) for the HADES Collaboration, CPOD 2007 1 Challenges in Physics & Instrumentation Results from Heavy Ion and Elementary.
Company Status and Overview of Recent Development Projects May 2011 to September 2012 David Baltz Chief Technologist Bladewerx LLC.
Update on H1 and ZEUS Computing for HERA-II Rainer Mankel DESY Hamburg HTASC Meeting, CERN, 2-Oct-2003.
p-DVCS and n-DVCS experiment status
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
Deeply Virtual Compton Scattering on the neutron
Handling/surviving with radiation effects in large scale complex systems (HEP experiment) Jorgen Christiansen PH-ESE.
Design and Initial Testing of Imager for Simultaneous Bilateral Optical Mammography
AHCAL – DIF Interface EUDET annual meeting – Paris8.-10. Oct. 2007 M. Reinecke.
Introduction Construction, Integration and commissioning on the surface Installation and commissioning after installation in the cavern Selected performance.