PROJECT: LARGE Group 16: RJ Landis David Leistiko Robert Worrell Advisors: Sergiu Dascalu, PhD Brian Westphal K.J. Holm (external)
Space Systems Architecture Lecture 3 Introduction to Tradespace Exploration Space Systems, Policy, and Architecture Research Consortium ©2002 Massachusetts.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
Inline Granulation of Stretch Film Jordan Bellomo Victor Castro Stephen Koellhoffer Zachary Magnone Matthew Manzione Precision AirConvey Team 5.
FMRI Compatible Mechatronic Ankle Device Presented by: Danielle Doane, Ben Foss-Michaelis, Brendon Reedy, Karina Snow, and Brandon Teller Advisors: Professor.
ContactPoint CYPD Information Support Team ContactPoint Presentation June 2007.
April 9-12, 2006 APPA 2006 Engineering & Operations Technical Conference Sacramento, California Reduction of Rainwater Intrusion Into Deerhaven Unit 2.
Scratch-it. Agenda Overall objective Customer needs Conceptual design Detailed design Evaluation Expansion Distribution strategy.
Can Crusher Group 2 Kyle Cleland Loren Lobbestael Thomas Pauly John Tasdemiroglu.
Slide 12.1 Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Object-Oriented Software Engineering WCB/McGraw-Hill, 2008 Stephen.
Learning from Programmatic Failures Paul Collopy [email protected].