Summary of results to date B. Garitte and A. Gens 2nd DECOVALEX 2011 workshop, 20 th of October 2008, Wakkanai, Japan Dept. of Geotechnical Engineering.
Introduction to the Task A Task Force Meeting B. Garitte and A. Gens 2nd DECOVALEX 2011 workshop, 20 th of October 2008, Wakkanai, Japan Dept. of Geotechnical.
Elisabeth Bouchaud GROUPE FRACTURE S ervice de P hysique et C himie
Current Status of CAS Team on Task A Step 0: Model Inception two-phase flowmodeling for the laboratory drying test – two-phase flow modeling for the laboratory.