1 Ardavan Asef-Vaziri Jan 2011Operations Management: Waiting Lines 1 Made-to-stock (MTS) operations. Product is manufactured and stocked in advance. Safety.
simulacion promodel
Input Analysis 1. Initial steps of the simulation study have been completed. Through a verbal description and/or flow chart of the system operation.