LHC status and commissioning plans Gianluigi Arduini, CERN, AB/ABP 10 th September 2007 Acknowledgements: R. Bailey, M. Lamont.
LHC status and commissioning plans Gianluigi Arduini, CERN, AB/ABP 10 th September 2007
LHC status and commissioning plans
Higgs Searches beyond the Standard Model at LHC (and at the B-factories) Michael Kobel TU Dresden DESY Seminars 26.6./27.6.2007.
Numerical Analysis of Corrugated Type Heat Exchanger with Variation in Corrugation Angle